Inspections for the day of: Wednesday, June 13, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00405 Aging Inspection6/13/20126/13/20126/14/2012 12:34:06 PM DONE
Permit finaled.
ESC12-00460 General Inspection6/13/20126/13/20126/14/2012 10:11:53 AM PASS
ESC12-00540 Tracking Control6/12/20126/13/20126/14/2012 9:41:26 AMAPART
Contractor has taken minimal measures on correcting the violation listed on the correction Notice. They are freaquently sweeping tracked materials at the end of the day. Have placed a top dressing to the construction access. Due to the contractor not implementing any reasonable dust control measures, dust plumes have traveled off site over 100ft multiple times. DEQ air Quality board was contacted over the concerns of this situation. Will ferquently inspect to ensure that tracking will be kept to a minimum. If excessive tracking occur again, a STOP WORK ORDER will be placed on the project and kept in place until it is clean up and measure are impplemented to control tracking to an acceptable allowance.
ESC12-00246 General Inspection6/13/20126/13/20126/13/2012 10:23:59 PM PART
Waiting for hydro seeding with a mulch tachifier blend to establish with a vegitative growth.
ESC12-00516 General Inspection6/13/20126/13/20126/13/2012 10:22:33 PM NR
ESC12-00448 General Inspection6/13/20126/13/20126/13/2012 10:21:59 PM NR
ESC11-00680 General Inspection6/13/20126/13/20126/13/2012 10:20:56 PMPPASS
ESC11-00176 BMP Violation6/13/20126/13/20126/13/2012 10:20:15 PMPFAIL
Verbal to RP:
Clean up all trash debris scattered through out the project area an placed into the provided trash containers. Place inlet protection into the storm drain that are not protected. Clean all hard surfaces of all sediment debris. Will re-inspect on 6/15/2012AM.
ESC12-00391 General Inspection6/13/20126/13/20126/13/2012 2:52:45 PM PASS
ESC11-00055 General Inspection6/13/20126/13/20126/13/2012 2:52:06 PM PASS
ESC11-00884 General Inspection6/13/20126/13/20126/13/2012 2:51:57 PMPFAIL
Verbal to RP
Post ESC sign where visable from the street. Clean up all sediment and debris off of the hard surfaces. MAintain storm drain inlet protection. Will follow up on 6/14/2012
ESC11-00192 General Inspection6/12/20126/13/20126/13/2012 7:26:21 AMANR
This project has not begun yet.