Inspections for the day of: Friday, June 13, 2014.
Number of inspections: 20
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS14-00132 BLD-Conference6/9/20146/9/2014 P 
Issue cn to obtain CO.
BLD14-00522 BLD-Final6/12/20146/13/20146/19/2014 8:50:34 AMPPASS
larry Phone #: ###-####
GCB14-00015 GCB-Framing6/13/20146/13/20146/19/2014 8:50:16 AMPDEFR
Dan ###-#### plans in fireplace at 460 51st
GCB14-00015 GCB-Energy6/13/20146/13/20146/19/2014 8:50:02 AMPDEFR
Dan ###-#### plans in fireplace at 460 51st
GCB14-00017 GCB-Framing6/13/20146/13/20146/19/2014 8:49:48 AMPDEFR
Dan ###-#### plans in fireplace at 460 51st
GCB14-00017 GCB-Energy6/13/20146/13/20146/19/2014 8:49:31 AMPDONE
Dan ###-####
BLD14-01012 BLD-Conference6/13/20146/13/20146/13/2014 3:28:06 PMPPASS
Framing inspection of Deloitte space, please contact Adam with any questions. Thanks akj. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD14-00660 BLD-Final6/13/20146/13/20146/13/2014 3:27:38 PMPPASS
Adam Phone #: ###-####
BLD14-00272 BLD-Final6/12/20146/13/20146/13/2014 3:27:18 PMPPASS
Final BLD inspection for Babcock T.I. . Call Adam for any access needs ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD14-00907 BLD-Conference6/13/20146/13/20146/13/2014 1:39:00 PMPPASS
Won''t be ready for inspection till 2:30/3:00. Phone #: ###-#### >> Inspection requested via web by Ben Sears
BLD13-02792 BLD-Footing6/13/20146/13/20146/13/2014 1:36:56 PMPPASS
Wes Phone #: ###-####
BLD13-01769 BLD-Framing/Rough-in6/13/20146/13/20146/13/2014 1:36:31 PMPPASS
Gary Phone #: ###-####
BLD14-01619 BLD-Final6/13/20146/13/20146/13/2014 12:00:05 PMPPASS
BLD14-01619 DOC - Permit Finaled6/13/20146/13/20146/13/2014 11:59:49 AMPPASS
BLD14-00165 BLD-Final6/12/20146/13/20146/13/2014 11:58:30 AMAPART
Jason Phone #: ###-#### needs plumbing and fire life safety ok to final after that.
BLD13-01634 BLD-Wall cover6/12/20146/13/20146/13/2014 11:56:38 AMAPASS
West half bathroom side area A kitchen studio 1st floor. Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
BLD14-00709 BLD-Final6/13/20146/13/20146/13/2014 9:40:45 AMACANC
18th Floor Observation Deck Final Inspection Request with Adam Johnson, ESI. Must call adam for Access, ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD14-00272 BLD-Ceiling Grid Inspection6/12/20146/13/20146/13/2014 9:40:19 AMAPASS
Final Ceiling sign off request for Babcock, exit corridor. Call Adam for any access needs ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD13-03022 BLD-Wall Bracing6/12/20146/13/20146/13/2014 9:16:14 AMAPART
Phone #: ###-#### >> Inspection requested via web by Austin Wagner ok to install house rap needs int hold down 4 fl to fl strap on ext
BLD13-02711 BLD-Wall Bracing6/12/20146/13/20146/13/2014 8:48:18 AMAPASS
Joey Phone #: ###-####