Inspections for the day of: Monday, June 13, 2016.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00313 INSP-Sprinkler Rough-in/Hydro6/13/20166/13/20166/13/2016 11:05:32 AMPFAIL
Resubmit hydraulic calculations to plan review showing the additional eight 3" 90's and pipe routing changes, provide sprinkler coverage under the combustible stairs (not shown on plans) per NFPA 8.15, two of the new branchlines appear to be blocked by 12" beams and 8" z-purlins, provide missing 4-way brace at the old anti-freeze loop location as per plans.
BLD16-01570 FIRE-Final Inspection6/13/20166/13/20166/13/2016 8:50:57 AMPFAIL
Provide suite number and provide lever hardware on all of the doors as per the approved plans.
FIR16-00333 INSP-Final Inspection6/10/20166/13/20166/13/2016 8:45:09 AMAPASS
Permit finaled
FIR16-00233 INSP-Final Inspection6/10/20166/13/20166/13/2016 8:30:32 AMAPASS
Permit finaled
BLD16-00265 FIRE-Final Inspection6/9/20166/13/20166/13/2016 8:29:35 AMAPASS
Life safety passed. I suggested that the contractor contact the plan reviewer and discuss the two existing doors in the corridor that are not shown on the plans.
BLD16-01570 FIRE-Final Inspection6/10/20166/13/20166/13/2016 8:03:01 AMAFAIL
Called contact three times with no answer. I went to project site but door was locked and no contact with any one. Jeremy Phone #: ###-####
FIR16-00371 INSP-Final Inspection6/10/20166/13/20166/10/2016 11:38:39 AMACANC
Plans on site Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball