Inspections for the day of: Wednesday, June 13, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00447 INSP-Alarm Testing6/13/20186/13/20186/13/2018 2:40:27 PMPPASS
Permit finaled

John Phone #: ###-####
BLD17-02777 FIRE-Final Inspection6/13/20186/13/20186/13/2018 2:39:52 PMPFAIL
Remove the deadbolts from doors 102A and 119A and provide with single action, ADA compliant, hardware. Remove the exit sign in the Hallway that directs people to the Service Bays. Provide exit sign at door 102A as per sheet E2.0L. Remove all of the padlock haps.


Please contact Tim Toups at the phone number listed. Phone #: ###-#### Inspection requested via web by Philip Allen
NAF18-00006 INSP-Sprinkler Rough-in6/12/20186/13/20186/13/2018 1:44:24 PMAPASS
The piping above the hardlids on the 3rd floor is ok for cover. I also did a preliminary rough-in inspection for all floors. Everything appears ok except for a few items which include branchline restraints will be required for the second floor/south side branchlines and an access panel is needed for the ball drip. Another rough-in inspection will be needed for a cover inspection once the sprinkler drops have been cut.


RICK FRY IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
FIR15-00171 INSP-Final Inspection6/12/20186/13/20186/13/2018 11:59:23 AMAPASS
permit finaled
FIR17-00522 INSP-Final Inspection6/12/20186/13/20186/13/2018 11:47:48 AMACANC
Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR18-00309 INSP-Final Inspection6/6/20186/13/20186/13/2018 11:34:39 AMAFAIL
For todays inspection I verified FACP, NAC panels, phone lines, Corridor smoke and Corridor notification spacing. We also set off the notification circuits. I noted that notification will need to be added in two areas. Several devices have been added and another deleted but are shown on the on site as-builts. No initiating devices have been tested. CO detectors may need to be relocated 3' from fan blades Several smoke detectors do need to be relocated more than 3' from diffusers.


Call prior to going Phone #: ###-#### >> Inspection requested via mobile web by Doug
NAF18-00049 INSP-Sprinkler Rough-in/Hydro6/12/20186/13/20186/13/2018 9:38:25 AMAPASS
Hydro test for the new piping in the Dining area passed.

Call prior to going Phone #: 2085611337 >> Inspection requested via mobile web by Gabe