BLD18-00221
| BLD-Final | 6/13/2018 | 6/13/2018 | 6/13/2018 4:53:20 PM | P | CANC |
|
|
ceil Phone #: ###-####
|
BLD17-01656
| BLD-Ceiling Grid Inspection | 6/13/2018 | 6/13/2018 | 6/13/2018 3:10:55 PM | P | PASS |
|
|
Matt Phone #: ###-####
|
BLD18-01762
| BLD-Footing | 6/12/2018 | 6/13/2018 | 6/13/2018 2:25:06 PM | P | PART |
|
|
Mercedes Phone #: ###-####. Needs to dig the southeast corner of footings to obtain min footing depth.
|
BLD18-01322
| BLD-Footing | 6/12/2018 | 6/13/2018 | 6/13/2018 2:24:10 PM | P | PART |
|
|
Mercedes Phone #: ###-####. Needs to raise forms to obtain min. depth required for footings. will recheck on stemwall inspection.
|
BLD17-03128
| BLD-Framing/Rough-in | 6/13/2018 | 6/13/2018 | 6/13/2018 1:33:17 PM | P | NR |
|
|
rough framing remainder Phone #: ###-#### Inspection requested via web by Darrell Gogert
|
BLD17-04568
| BLD-Foundation | 6/12/2018 | 6/13/2018 | 6/13/2018 10:28:57 AM | A | PART |
|
|
Late morning would be good. We have concrete scheduled for 1:00 Phone #: ###-#### Inspection requested via web by Bob Thornton. work in progress. Will have special inspection.
|
BLD17-03244
| BLD-Framing/Rough-in | 6/12/2018 | 6/13/2018 | 6/13/2018 9:55:24 AM | A | PART |
|
|
call 30 min befoer so i can be there. Phone #: ###-#### Inspection requested via web by Todd Landvatter. Storefront effis only ok. Need architect to provide aditional details for 2 hr. ratings on east conopy and for interior demissing wall.
|
BLD18-01192
| BLD-Energy code compliance | 6/12/2018 | 6/13/2018 | 6/13/2018 9:12:44 AM | A | PASS |
|
|
Brian Phone #: ###-####
|