ELE15-03345
| Final | 6/13/2019 | 6/13/2019 | 6/13/2019 2:40:14 PM | P | PASS |
|
|
scheduled to close permit...contractor called and has fixed corrections..life events was reason for delay
|
ELE15-02844
| Final | 6/13/2019 | 6/13/2019 | 6/13/2019 2:19:43 PM | P | PASS |
|
|
sent Darrell a text with the Available fault current tag installed. it is in a locked site. Phone #: ###-#### Inspection requested via web by A.M.E. Office...ok to final...job completed
|
ELE19-01735
| Final | 6/13/2019 | 6/13/2019 | 6/13/2019 1:51:50 PM | P | PART |
|
|
Wires capped and taped off on exterior wiring inside terminated into outlets Phone #: ###-#### Inspection requested via web by Derik Sutton... lobby area lighting and bathrooms complete exterior lighting safed off and out of reach of customers...will be completed within week stated by contractor
|
ELE19-02070
| Final | 6/13/2019 | 6/13/2019 | 6/13/2019 1:32:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen... disconnect, OCPD, and labelling ok to final
|
ELE19-01771
| Final | 6/13/2019 | 6/13/2019 | 6/13/2019 12:28:40 PM | P | PASS |
|
|
call me 30 min in advance and i will be there or give you the lock box code! Thx Steve Phone #: ###-#### Inspection requested via web by Steven Meredith...ok to final
|
ELE19-01422
| Final | 6/12/2019 | 6/13/2019 | 6/13/2019 11:16:53 AM | A | PASS |
|
|
Final Inspection Request
Builder Access Code is 1515
Thank You Phone #: ###-#### Inspection requested via web by Paula Gratiot... ok to final
|
ELE18-01718
| Final | 6/12/2019 | 6/13/2019 | 6/13/2019 10:55:30 AM | A | PASS |
|
|
Final inspection please. Have a bless day! Phone #: ###-#### Inspection requested via web by Kyle Lott...ok to final
|
ELE18-04013
| Final | 6/12/2019 | 6/13/2019 | 6/13/2019 10:15:10 AM | A | PASS |
|
|
Labeling of roof top units done ready for final. Thank You Phone #: ###-#### Inspection requested via web by Kelly Felin... disconnect labelling and panel labelling ok to final
|
ELE19-02106
| Electrical Rough-In | 6/12/2019 | 6/13/2019 | 6/13/2019 9:51:30 AM | A | PASS |
|
|
Walls Phone #: ###-#### Inspection requested via web by Jim Williams... wall cover only ok
|
ELE19-01735
| Final | 6/13/2019 | 6/13/2019 | 6/13/2019 9:12:58 AM | A | NR |
|
|
Partial final- interior of building complete. Will complete exterior next week when it’s ready for us. Thankyou Phone #: ###-#### Inspection requested via web by Derik Sutton...
exterior wires need safed off away from contact interior lobby not complete...exposed wiring not complete
|
ELE19-01712
| Final | 6/12/2019 | 6/13/2019 | 6/13/2019 8:33:53 AM | A | PASS |
|
|
Suite 160, not 150. Phone #: ###-#### Inspection requested via web by Bryan Atkins.. ok to final
|
ELE18-03224
| Electrical Rough-In | 6/12/2019 | 6/13/2019 | 6/13/2019 8:23:41 AM | A | PASS |
|
|
Contact: Wes Powell ... ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden...ceiling grid ok
|