Inspections for the day of: Friday, June 14, 1996.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE96-01714 INSP - Temporary service6/14/19966/14/19966/14/1996 12:00:00 AM PASS
/ / 315 - 49&14 ok jf u/g new
ELE95-01600 INSP - Final6/13/19966/14/19966/14/1996 12:00:00 AMAPASS
06/13/96 315 - IM NOT SURE IF THERE IS A FINAL ON THIS OR NOT? TERRY HAS THINK THEY NEED A FINAL THANKS BUDDY 14 was done on 12/26/95 by me 14 o
ELE96-01005 INSP - Electrical Rough-In6/13/19966/14/19966/14/1996 12:00:00 AMAPASS
06/13/96 315 - FOREMAN PAGER NO. ###-#### BLDG 22/MICRON. 09 ok jf
ELE96-01465 INSP - Permanent service6/13/19966/14/19966/14/1996 12:00:00 AMAPASS
06/13/96 315 - LEE RILEY SAID YOU KNOW ALL ABOUT THIS INSPECTION. 53 ok jf o/h rec
ELE96-00152 INSP - Final6/14/19966/14/19966/14/1996 12:00:00 AMPPASS
06/14/96 315 - THIS A REINSPECT PER YOUR REQUEST. 14 ok jf no wiring to not anchored so it can be moved
ELE96-00914 INSP - Final6/14/19966/14/19966/14/1996 12:00:00 AMPPASS
06/14/96 315 - DID YOU GO OUT AND DO A R/I AND A P/S ON THIS NOTHING IN DATE IN MARCH NO INSPECTION IN THE COMPUTER STATING DONE 14 ok jf 09&53 done and ok 3/25/96, I did it on the wrong pm#96-0941 it should have been ele96-0914
ELE96-01714 INSP - T/S and Final6/13/19966/14/19966/14/1996 12:00:00 AMPFAIL
06/13/96 315 - THIS IS A REINSPECTION. 49&14 failed cor. posted jf
ELE96-01866 INSP - T/S and Final6/14/19966/14/19966/14/1996 12:00:00 AMPPASS
06/14/96 315 - 49&14 ok jf u/g new