Inspections for the day of: Friday, June 14, 2002.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00646 BLD-Final6/12/20026/14/20026/14/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/12/2002 at 15:37:50. Contact: ###-####. ada grab bars and door hardware. 6/14/2002 2:46:31 PM
BLD01-00655 BLD-Final6/12/20026/14/20026/14/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/12/2002 at 15:38:56. Contact: ###-####. fire stop/engery seal ele boxes. 6/14/2002 2:46:01 PM
BLD02-01163 BLD-Energy code compliance6/13/20026/14/20026/14/2002 12:00:00 AMAPART
FOR A METAL ROOF ###-#### BILL no roof access recall. 6/14/2002 9:05:29 AM
BLD02-00631 BLD-Energy code compliance6/13/20026/14/20026/14/2002 12:00:00 AMAPASS
CHRIS ###-####
BLD02-00946 BLD-Energy code compliance6/13/20026/14/20026/14/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/13/2002 at 13:00:35. Contact: ###-####.
BLD02-00946 BLD-Framing/Rough-in6/13/20026/14/20026/14/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/13/2002 at 13:02:26. Contact: ###-####. c/n made ok 6/14/2002 9:53:58 AM
BLD02-01159 BLD-Framing/Rough-in6/13/20026/14/20026/14/2002 12:00:00 AMAPART
###-#### AL ###-#### AL putty pads at ele on demising wall/ top of walls/sprinkler insp. 6/14/2002 11:11:49 AM
BLD01-02034 BLD-Final6/13/20026/14/20026/14/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/13/2002 at 16:39:44. Contact: ###-####. needs ele final and hd verifaction c/n history. 6/14/2002 11:26:16 AM
BLD02-00724 BLD-Energy code compliance6/13/20026/14/20026/14/2002 12:00:00 AMAPASS
scott- ###-####
BLD02-00631 BLD-Framing/Rough-in6/14/20026/14/20026/14/2002 12:00:00 AMAPASS
c/n made ok
BLD01-01573 BLD-Conference6/13/20026/14/20026/14/2002 12:00:00 AMAPASS
need extension- kathy- ###-#### call 1st before ok for wip.ele. 6/18/2002 2:49:11 PM
BLD01-01218 BLD-Conference6/13/20026/14/20026/14/2002 12:00:00 AMPNH
###-#### helen please call her at this # first called no ancer. 6/17/2002 3:10:33 PM
BLD02-00993 BLD-Framing/Rough-in6/14/20026/14/20026/14/2002 12:00:00 AMPPART
###-#### c/n made ok for exterior brace panal nailling. 6/14/2002 4:17:06 PM
MEC02-01562 Rough-in6/14/20026/14/20026/14/2002 12:00:00 AMPNR
MARK ###-####
BLD01-03225 BLD-Foundation6/14/20026/14/20026/14/2002 12:00:00 AMPCANC
NICK ###-#### wrong type of insp requsted. 6/14/2002 3:25:19 PM
BLD01-02848 BLD-Other6/14/20026/14/20026/14/2002 12:00:00 AMPCANC
###-#### ###-#### less called and cancled. 6/14/2002 3:27:50 PM
BLD01-03225 BLD-Framing/Rough-in6/14/20026/14/20026/14/2002 12:00:00 AMPPART
interior holddowns in place with nut.
BLD02-00914 BLD-Framing/Rough-in6/13/20026/14/20026/14/2002 12:00:00 AMPNR
BRIAN ###-#### nail 3 ply girders/ finsh fur outs and hanger at stairs mlb. 6/14/2002 4:02:10 PM
BLD02-00494 BLD-Final6/13/20026/14/20026/14/2002 12:00:00 AMPNR
DUANE MARLER ###-#### CALL 1ST PLEASE