Inspections for the day of: Friday, June 14, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-01742 Water and/or Sewer6/13/20026/14/20026/14/2002 12:00:00 AMAPART
WATER ONLY SHELBY ###-#### water service only ok 6/14/2002 8:48:47 AM
PLM02-00906 Plumbing Rough-in6/13/20026/14/20026/14/2002 12:00:00 AMAPART
ROOF DRAIN /GRID DONNY ###-#### test ok on rd and of on front eyebrows, needs hangers 6/14/2002 10:06:25 AM
PLM02-01744 Plumbing Rough-in6/13/20026/14/20026/14/2002 12:00:00 AMANR
GARY ###-####
PLM01-03056 Final6/13/20026/14/20026/14/2002 12:00:00 AMAPASS
fn jim ###-#### fn
PLM02-01370 Final6/14/20026/14/20026/14/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/14/2002 at 06:36:45. Contact: ###-####.
PLM02-01733 Sprinkler (Final)6/13/20026/14/20026/14/2002 12:00:00 AMAPART
###-#### needs 160 ustream of the dcva 6/14/2002 11:25:21 AM
PLM02-00834 Final6/13/20026/14/20026/14/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/13/2002 at 15:10:09. Contact: ###-####. dcva required on ice mech, seal around floor sink in wait station, temp occ ok 6/14/2002 2:49:00 PM
PLM02-01608 Sprinkler (Final)6/14/20026/14/20026/14/2002 12:00:00 AMPPART
chad ###-#### tie in ok dcva needs tested 6/14/2002 3:04:21 PM
PLM02-01730 Water and/or Sewer6/14/20026/14/20026/14/2002 12:00:00 AMPPASS
MATT ###-####
PLM02-01716 Plumbing Rough-in6/14/20026/14/20026/14/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2002 at 10:43:11. Contact: ###-####.
PLM02-01755 Sprinkler (Final)6/14/20026/14/20026/14/2002 12:00:00 AMPPASS
BACKFLOW ###-#### JUSTIN
PLM02-01733 Sprinkler (Final)6/14/20026/14/20026/14/2002 12:00:00 AMPPASS
Scheduled by Inspector: 330 On 6/14/2002 11:24:51 AM needs 160 psi upstream of the dcva, will leave some exposed, ok to cover tie in
PLM01-02684 Final6/14/20026/14/20026/14/2002 12:00:00 AMPPASS
Scheduled by Inspector: 330 On 6/14/2002 11:47:17 AM
PLM02-01029 Final6/14/20026/14/20026/14/2002 12:00:00 AMPPASS