Inspections for the day of: Friday, June 14, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00207 INSP-Sprinkler Rough-in/Hydro6/13/20026/14/20026/14/2002 12:00:00 AMAPART
RICK ###-#### r/i of wet okay; hydro pass 6/14/2002 3:36:54 PM
BLD01-00646 FIRE-Final Inspection6/13/20026/14/20026/14/2002 12:00:00 AMAPASS
###-#### frank
BLD01-00645 FIRE-Final Inspection6/13/20026/14/20026/14/2002 12:00:00 AMAFAIL
###-#### frank need canopies for fire sprinklers 6/14/2002 11:07:07 AM
BLD01-01641 FIRE-Sprinkler Rough-in6/14/20026/14/20026/14/2002 12:00:00 AMAFAIL
Added by Inspector: 409 On 6/14/2002 11:00:34 AM r/i okay; not approved for cover pending tenting of wet sprinkler piping
FIR01-00480 INSP-Final Inspection6/14/20026/14/20026/14/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 6/14/2002 11:01:42 AM
FIR01-00479 INSP-Final Inspection6/14/20026/14/20026/14/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 6/14/2002 11:05:10 AM
FIR02-00130 INSP-Sprinkler Rough-in/Hydro6/13/20026/14/20026/14/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/13/2002 at 08:18:42. Contact: ###-####. received call from Mike of Shilo and he said he wouldn't be there and he would reschedule for next week; went to job trailer and reviewed plans; left c/n with Les about having provisions to test flow switches in gas rooms 6/14/2002 3:49:18 PM
FIR02-00138 INSP-Sprinkler Rough-in/Hydro6/14/20026/14/20026/14/2002 12:00:00 AMPPART
Scheduled by Inspector: 409 On 6/14/2002 8:49:02 AM m hydro on ug okay 6/14/2002 3:37:33 PM
FIR01-00422 INSP-Sprinkler Rough-in/Hydro6/14/20026/14/20026/14/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2002 at 09:06:06. Contact: ###-####. hydro okay 6/14/2002 3:37:52 PM