FIR02-00207
| INSP-Sprinkler Rough-in/Hydro | 6/13/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | A | PART |
|
|
RICK ###-#### r/i of wet okay; hydro pass 6/14/2002 3:36:54 PM
|
BLD01-00646
| FIRE-Final Inspection | 6/13/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | A | PASS |
|
|
###-#### frank
|
BLD01-00645
| FIRE-Final Inspection | 6/13/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | A | FAIL |
|
|
###-#### frank need canopies for fire sprinklers 6/14/2002 11:07:07 AM
|
BLD01-01641
| FIRE-Sprinkler Rough-in | 6/14/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 409 On 6/14/2002 11:00:34 AM r/i okay; not approved for cover pending tenting of wet sprinkler piping
|
FIR01-00480
| INSP-Final Inspection | 6/14/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 6/14/2002 11:01:42 AM
|
FIR01-00479
| INSP-Final Inspection | 6/14/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 6/14/2002 11:05:10 AM
|
FIR02-00130
| INSP-Sprinkler Rough-in/Hydro | 6/13/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 08:18:42. Contact: ###-####. received call from Mike of Shilo and he said he wouldn't be there and he would reschedule for next week; went to job trailer and reviewed plans; left c/n with Les about having provisions to test flow switches in gas rooms 6/14/2002 3:49:18 PM
|
FIR02-00138
| INSP-Sprinkler Rough-in/Hydro | 6/14/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 409 On 6/14/2002 8:49:02 AM m hydro on ug okay 6/14/2002 3:37:33 PM
|
FIR01-00422
| INSP-Sprinkler Rough-in/Hydro | 6/14/2002 | 6/14/2002 | 6/14/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/14/2002 at 09:06:06. Contact: ###-####. hydro okay 6/14/2002 3:37:52 PM
|