Inspections for the day of: Thursday, June 14, 2012.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00746 FIRE-Final Inspection6/14/20126/14/20126/14/2012 4:23:54 PMANR
FIR11-00651 INSP-Sprinkler Rough-in/Hydro6/14/20126/14/20126/14/2012 4:22:45 PMPPART
Wet system passed hydrostatic test.
FIR12-00066 INSP-Alarm Testing6/14/20126/14/20126/14/2012 3:45:59 PMPPEND
Final scheduled 6/15 AM.
FIR12-00296 INSP-Final Inspection6/14/20126/14/20126/14/2012 3:44:26 PMPPASS
Scope of demo permit work completed satisfactory. Final status approved.
FIR11-00587 INSP-Sprinkler Rough-in6/14/20126/14/20126/14/2012 3:41:22 PMPPART
Four new heads and related branchline piping at the new MRI room fed from the preaction system (project phase 3) are okay for cover.
BLD11-01743 FIRE-Sprinkler Rough-in6/14/20126/14/20126/14/2012 3:39:20 PMPPART
Overhead fire sprinkler work at the grid ceilings approved for cover.
FIR12-00154 INSP-Conference6/14/20126/14/20126/14/2012 3:37:08 PMADONE
Regarding project inspection schedule.
BLD12-00581 FIRE-Final Inspection6/14/20126/14/20126/14/2012 3:36:03 PMANH
BLD12-01090 FIRE-Final Inspection6/13/20126/14/20126/14/2012 3:35:24 PMAPASS
Life safety inspection passed. Scope of permit work completed.