PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, June 14, 2016
.
Number of inspections:
18
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-01343
General Inspection
6/9/2016
6/14/2016
6/15/2016 3:05:41 PM
A
CANC
ESC15-00504
General Inspection
6/10/2016
6/14/2016
6/15/2016 11:03:24 AM
A
CANC
rescheduled for RP walk-through
ESC16-00269
General Inspection
6/14/2016
6/14/2016
6/14/2016 3:54:01 PM
P
PART
Verbal CN issued to RP Lavon
- change out inlet bag down the street on Mortimer. It is full and no longer filtering water. Some sediment in the road and gutter in front of the project is causing a muddy runoff now by-passing treatment. DI needs to be changed ASAP
VM left - will check back in AM if no call back.
ESC16-00268
General Inspection
6/14/2016
6/14/2016
6/14/2016 3:38:20 PM
P
PASS
Carwash retrofit complete. All disturbed area stabilized. All permits finaled. ESC condtions satisfied.
ESC16-00268
DOC - Permit Finaled
6/14/2016
6/14/2016
6/14/2016 3:37:49 PM
P
PASS
ESC13-00193
General Inspection
6/14/2016
6/14/2016
6/14/2016 2:59:28 PM
PASS
ESC15-01210
Complaint Inspection
6/14/2016
6/14/2016
6/14/2016 2:59:11 PM
P
PART
No activity, equipment, or employees on site at time of inspeciton. Report of fugitive dust issues and a runaway equipment damaging property.
Corrections are needed:
- pick up all unused BMPs (wattles) laying around site
- complete sweeping up dirt from site collected in gutter on Sherman and at the divergence on Sherman and Ada
- pick up uncontained trash pile towards top of project and any other loose trash around site
- install sediment control BMP or diversion to prevent muddy water from the uncompleted portion of the street to flow down through old portion of Sherman and into Northend.
- conduct site walk through conference to discuss plan to stabilize slopes to prevent erosion and sediment runoff (the proposed meeting)
ESC15-01256
General Inspection
6/14/2016
6/14/2016
6/14/2016 2:25:54 PM
PASS
ESC15-01040
Aging Inspection
6/14/2016
6/14/2016
6/14/2016 1:53:19 PM
PASS
ESC15-01287
General Inspection
6/14/2016
6/14/2016
6/14/2016 11:44:07 AM
PASS
ESC15-01061
General Inspection
6/14/2016
6/14/2016
6/14/2016 11:43:51 AM
PEND
Landscaping in progress and access road built to back of house on the adjacent lot. This will need stabilization. Need to remove DI bag that is closest to house to the East..
BLD already finaled.
ESC16-00483
Random Inspection
6/14/2016
6/14/2016
6/14/2016 10:41:08 AM
A
PASS
WIP. No violations. Frame is up, driveway not yet poured
ESC15-00835
DOC - Permit Finaled
6/14/2016
6/14/2016
6/14/2016 10:23:05 AM
P
PASS
ESC15-01184
General Inspection
6/14/2016
6/14/2016
6/14/2016 10:17:17 AM
PART
WIP on vertical wood frame above the lower level concrete podium. Both site gates have stabilized rock construction entrances. No trackout to 9th or River Street.
All receiving inlets have filter bag protection in good condition. No discharges, no fugitve dust observed.
Correction request:
- sweep up loose dirt and gravel in street on 8th Street. Pick up litter, some of it likely from employees
Note: closed initial demo and site set up permit ESC15-00789
ESC04-00068
DOC - Permit Finaled
6/14/2016
6/14/2016
6/14/2016 9:10:36 AM
P
PASS
old expired parks' annual permit removed from system.
ESC15-00789
General Inspection
6/14/2016
6/14/2016
6/14/2016 9:06:46 AM
PASS
Initial permit for old building demo and site set up shall be replaced by the Afton Phase I permit ESC 15-01184, which is now in progress.
No further inspections on this permit, this phase complete. Same RP for new permit Matt with Andersen.
ESC15-00789
DOC - Permit Finaled
6/14/2016
6/14/2016
6/14/2016 9:05:05 AM
P
PASS
ESC15-00590
Site Final
6/14/2016
6/14/2016
6/14/2016 8:00:43 AM
A
PASS
Parks and Rec annual permit for 2###-#### shall be replaced by their new annual permit for 2###-####. Projects remained in compliance. Larger parks projects with sub-contractors are covered seperately.
New permit # is ESC16-00793