Inspections for the day of: Thursday, June 14, 2018.
Number of inspections: 29
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00627 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:45:38 PMPCANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR17-00689 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:45:14 PMPCANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00473 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:44:49 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
FIR18-00472 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:44:36 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
FIR18-00471 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:44:20 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
FIR18-00470 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:44:02 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
FIR18-00469 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:43:47 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
FIR18-00468 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:43:33 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
FIR18-00467 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:43:12 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
FIR18-00466 INSP-Final Inspection6/13/20186/14/20186/14/2018 2:42:48 PMACANC
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Dave Phone #: ###-####
BLD17-01763 FIRE-Conference6/14/20186/14/20186/14/2018 2:41:40 PMPDONE
Fire conference complete.

Phone #: ###-#### Inspection requested via web by Mike Beeson
FIR18-00124 INSP-Final Inspection6/12/20186/14/20186/14/2018 2:41:08 PMAFAIL
Fire alarm panel model installed does not match what was submitted, issue will need to be resolved before testing/inspection can be performed.

On-Site Contact, Randy Burkland Phone #: ###-#### Inspection requested via web by Bruce Sullivan
FIR18-00381 INSP-Sprinkler Rough-in/Hydro6/13/20186/14/20186/14/2018 1:29:31 PMAPASS
Rough to cover inspection for underground supply complete, approved for cover.

Underground rough in Please call James Mair.

Thank you Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR18-00269 INSP-Final Inspection6/14/20186/14/20186/14/2018 12:36:10 PMPPASS
Final inspection for AES communicator complete.

Peter is available to meet Jim to do the final no later than 2:00 pm. (He has an appt in Nampa at 3:00.) Plz call ###-#### for a 30 minute lead time to make sure Peter can meet Jim on time at the location. Phone #: ###-#### Inspection requested via web by Laura Tyson
BLD18-00623 FIRE-Final Inspection6/13/20186/14/20186/14/2018 12:35:31 PMAPASS
Final life fire safety inspection for area of work complete.

Eric Phone #: ###-####
BLD18-00825 FIRE-Final Inspection6/13/20186/14/20186/14/2018 12:34:58 PMAPASS
Final life fire safety inspection for area of work complete.

Eric Phone #: ###-####
FIR17-00267 INSP-Sprinkler Rough-in/Hydro6/13/20186/14/20186/14/2018 10:58:20 AMAPART
Hydrostatic test for levels 2, 4 and 5 witnessed, no pressure loss observed at riser provided gauges. Level 3 still needs hydro completed.

Contact Ken Orahood, ###-#### 30 min prior to Hyro Insp start on levels 2, 4, ; 5 please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR16-00563 INSP-Sprinkler Rough-in6/13/20186/14/20186/14/2018 10:54:09 AMAPART
Rough to cover inspection for overhead fire sprinkler piping above hardids on levels 4 and 5 complete, approved for cover.



Cover inspection for 4th ; 5th Floor Phone #: ###-#### Inspection requested via web by Christophe Wilson
FIR17-00755 INSP-Final Inspection6/13/20186/14/20186/14/2018 10:43:34 AMAPASS
Final fire sprinkler inspectin for area of work complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
BLD17-02765 FIRE-Final Inspection6/14/20186/14/20186/14/2018 10:13:47 AMPFAIL
Mount knox box as discussed, provide property addressing as discussed, install ceiling tile in southeast office area as discussed.



Dave Phone #: ###-####
BLD17-04457 FIRE-Final Inspection6/14/20186/14/20186/14/2018 10:10:18 AMPFAIL
FIR permit for fire alarms needs to be finaled, contractor for HVAC control was not able to be contacted at time of inspection, a re-inspection will be required for fire alarm to final FIR permit.

Dave Phone #: ###-####
FIR18-00090 INSP-Final Inspection6/13/20186/14/20186/14/2018 9:52:16 AMAPASS
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00043 INSP-Final Inspection6/13/20186/14/20186/14/2018 9:24:59 AMAFAIL
Audio/visual device testing complete, could not verify HVAC unti shutdown because we could no get the unti to run. HVAC unit shutdown is required.

Phone #: ###-#### Inspection requested via web by Nathan Price
FIR17-00710 INSP-Final Inspection6/13/20186/14/20186/14/2018 9:23:48 AMAPASS
Final fire alarm inspection for core and shell complete.

Phone #: ###-#### Inspection requested via web by Nathan Price
FIR18-00051 INSP-Final Inspection6/13/20186/14/20186/14/2018 9:23:00 AMAPASS
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00095 INSP-Final Inspection6/13/20186/14/20186/14/2018 9:22:25 AMAPASS
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00079 INSP-Final Inspection6/13/20186/14/20186/14/2018 7:54:38 AMAPASS
Freezer has been removed, final fire sprinkler inspection for area of work complete.

Rick Fry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
FIR18-00287 INSP-Final Inspection6/13/20186/14/20186/14/2018 7:39:51 AMAPASS
Final fire alarm inspection for area of work complete.

Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
FIR18-00335 INSP-Final Inspection6/12/20186/14/20186/14/2018 7:39:07 AMAPASS
Final fire alarm inspection for area of work complete.

Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis