Inspections for the day of: Thursday, June 15, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorLee Rice
TitlePLM-CHIEF INSPECTOR
Phone #794-9486
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-02052 Final6/14/20006/15/20006/15/2000 12:00:00 AMAPASS
###-#### ext 31 don- connection to mobile home for w/s
PLM00-01421 Final6/14/20006/15/20006/15/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/14/2000 at 11:54:09. Contact: ###-####. Correctin; toilet clearance 6/15/00 1:51:09 PM
PLM99-03855 Other6/14/20006/15/20006/15/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/14/2000 at 13:24:12. Contact: ###-####. Bathroom fixture measurments not ADA complaint/notified to contact structural & follow ADA. 6/15/00 1:50:44 PM
PLM00-02061 Sprinkler (Final)6/14/20006/15/20006/15/2000 12:00:00 AMAFAIL
Rod ###-####
PLM00-01159 Plumbing Rough-in6/14/20006/15/20006/15/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2000 at 15:21:11. Contact: ###-####.
PLM00-01159 Roof Drains6/14/20006/15/20006/15/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2000 at 15:22:02. Contact: ###-####.
PLM00-01911 Plumbing Rough-in6/15/20006/15/20006/15/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/15/2000 at 08:46:24. Contact: ###-####.
PLM00-02071 Sprinkler (Final)6/15/20006/15/20006/15/2000 12:00:00 AMPPASS
###-####--DOUG BACKFLOW INSP
PLM00-01991 Plumbing Rough-in6/15/20006/15/20006/15/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/15/2000 at 10:35:10. Contact: ###-####. Test failed 6/16/00 8:56:17 AM