Inspections for the day of: Friday, June 15, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Ray
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-01789 Final6/14/20016/15/20016/15/2001 12:00:00 AMAPASS
###-####
ELE01-01913 Rough-In Permanent Service6/14/20016/15/20016/15/2001 12:00:00 AMAPASS
dan ###-#### p/s ug n ok 6/15/2001 1:59:30 PM
ELE01-00590 Final6/14/20016/15/20016/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/14/2001 at 22:08:21. Contact: ###-####.
ELE01-01872 Temporary Service6/15/20016/15/20016/15/2001 12:00:00 AMPPASS
###-#### t/s ug n ok 6/15/2001 11:25:48 AM
ELE01-01234 Final6/15/20016/15/20016/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/15/2001 at 08:16:32. Contact: ###-####.
ELE01-01710 Electrical Rough-In6/15/20016/15/20016/15/2001 12:00:00 AMPPASS
Rick ###-####
ELE01-01899 Electrical Rough-In6/15/20016/15/20016/15/2001 12:00:00 AMPPASS
above ceiling Chip ###-####
ELE01-01485 Final6/14/20016/15/20016/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2001 at 21:23:09. Contact: ###-####.
ELE01-01627 Final6/14/20016/15/20016/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2001 at 21:23:54. Contact: ###-####.
ELE01-01202 Final6/14/20016/15/20016/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2001 at 16:03:36. Contact: ###-####.
ELE01-01952 Final6/14/20016/15/20016/15/2001 12:00:00 AMPFAIL
joe- ###-#### for spa 680-6 gfci lite/680-22 shall bond back to equip. 6/15/2001 1:19:47 PM