Inspections for the day of: Friday, June 15, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS01-00031 MIS-Aging Inspection6/15/20016/15/20016/15/2001 12:00:00 AM CANC
BLD01-01334 BLD-Energy code compliance6/14/20016/15/20016/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/14/2001 at 13:23:05. Contact: ###-####.
BLD00-03627 BLD-Framing/Rough-in6/14/20016/15/20016/15/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/14/2001 at 13:35:30. Contact: ###-####.no plans 6/15/2001 9:13:47 AM
BLD00-03133 BLD-Framing/Rough-in6/14/20016/15/20016/15/2001 12:00:00 AMACANC
###-#### ###-#### ###-#### JIM COOK THIS STRUCTURE IS NOT CONNECTED TO THE HOUSE NO ONE WILL BE THERE.
340 took 4 me 6/15/2001 9:29:35 AM
BLD01-00683 BLD-Framing/Rough-in6/13/20016/15/20016/15/2001 12:00:00 AMAFAIL
Brian ###-####
not done yet 6/15/2001 1:04:07 PM
BLD01-00187 BLD-Foundation6/14/20016/15/20016/15/2001 12:00:00 AMAPASS
###-####
pending s. i. report 6/15/2001 10:12:33 AM
BLD01-01578 BLD-Footing6/14/20016/15/20016/15/2001 12:00:00 AMAPART
###-####
ftg. for stairs, window well, wip 6/15/2001 11:25:33 AM
BLD01-00605 BLD-Foundation6/15/20016/15/20016/15/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/15/2001 at 07:10:32. Contact: ###-####.not set up yet 6/15/2001 10:45:47 AM
BLD98-03942 BLD-Final6/14/20016/15/20016/15/2001 12:00:00 AMPPASS
fn- ken-- cell ###-####
BLD00-02465 BLD-Final6/14/20016/15/20016/15/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2001 at 14:47:45. Contact: ###-####.
looks ok as long as others are signed off 6/15/2001 4:47:18 PM
BLD01-01564 BLD-Energy code compliance6/14/20016/15/20016/15/2001 12:00:00 AMPPART
ok to cover except fireplace 6/15/2001 4:06:59 PM
BLD01-00567 BLD-Framing/Rough-in6/15/20016/15/20016/15/2001 12:00:00 AMPPART
Stan ###-#### bathroom ceilings ok after trades sign off 6/15/2001 1:36:23 PM
BLD01-01215 BLD-Foundation6/15/20016/15/20016/15/2001 12:00:00 AMPPART
Ryan ###-####
verbal corrections, pouring 6/15/2001 3:48:21 PM
BLD00-03627 BLD-Framing/Rough-in6/15/20016/15/20016/15/2001 12:00:00 AMPPART
shear
ext. shear ok 6/15/2001 3:09:04 PM
BLD01-00004 BLD-Final6/15/20016/15/20016/15/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 06/15/2001 at 11:03:50. Contact: ###-####.
conf. only on final inspection 6/15/2001 1:05:20 PM