FIR09-00247
| INSP-Sprinkler Rough-in/Hydro | 6/15/2009 | 6/15/2009 | 6/16/2009 3:02:47 PM | P | PASS |
|
|
The overhead hydro test passed. The FDC piping was not included in the hydro test and will need to be done.
|
FIR09-00078
| INSP-Final Inspection | 6/12/2009 | 6/15/2009 | 6/16/2009 9:41:44 AM | P | PASS |
|
|
Permit finaled
|
FIR09-00078
| INSP-Final Inspection | 6/15/2009 | 6/15/2009 | 6/16/2009 9:41:24 AM | A | PASS |
|
|
Permit finaled.
|
FIR08-00830
| INSP-Sprinkler Rough-in/Hydro | 6/12/2009 | 6/15/2009 | 6/16/2009 7:37:25 AM | P | PART |
|
|
See the city approved plans for deficiancies that need corrected on the first and second floors.
|
FIR09-00120
| INSP-Final Inspection | 6/12/2009 | 6/15/2009 | 6/15/2009 2:33:37 PM | A | FAIL |
|
|
See the city approved plans for the location where one horn/strobe failed to operate. The candella had to be changed on three others while I waited. A re-inspection fee has been applied.
|
BLD09-00654
| FIRE-Final Inspection | 6/12/2009 | 6/15/2009 | 6/15/2009 11:31:28 AM | A | PASS |
|
|
Life safety passed.
|
FIR09-00361
| INSP-Final Inspection | 6/12/2009 | 6/15/2009 | 6/15/2009 11:28:01 AM | A | FAIL |
|
|
The hood suppression system contractor did not show up for the test so no testing was performed. To be rescheduled for tomorrow.
|
BLD09-00747
| FIRE-Final Inspection | 6/11/2009 | 6/15/2009 | 6/15/2009 11:16:33 AM | A | FAIL |
|
|
The project related fire alarm, hood suppression system and fire sprinkler permits needed addressed first. I did a courtesy inspection and pointed out several deficiencies.
|
FIR09-00078
| INSP-Final Inspection | 6/15/2009 | 6/15/2009 | 6/15/2009 10:47:31 AM | P | CANC |
|
|
Duplicate inspection
|
FIR09-00360
| INSP-Final Inspection | 6/12/2009 | 6/15/2009 | 6/15/2009 10:39:10 AM | A | FAIL |
|
|
I waited at the job site for as long as I could but contractor was unable to make it. To be rescheduled for tomorrow.
|