ESC07-00070
| General Inspection | 6/15/2009 | 6/15/2009 | 6/15/2009 4:42:03 PM | P | PASS |
|
|
Site looks good. Stabilization of the hillside is coming along good. Vegitation is becoming established where hydro seed was applied. After the rain event of the past two weeks all has held up well.
|
ESC07-00986
| BMP Violation | 6/15/2009 | 6/15/2009 | 6/15/2009 2:09:49 PM | P | FAIL |
|
|
Correction Notice: 1. Provide sediment controls along Allumbaugh. 2. Clean up and capture all turbid water at the storm drains along Allumbaugh. 3. Clean up all sediment and debris along Allumbaugh. Failure to comply will result in a Stop Work Order and further enforcement. Will re-inspect on 6/16/09 AM.
|
ESC09-00006
| Site Final | 4/30/2009 | 6/15/2009 | 6/15/2009 1:25:34 PM | A | PASS |
|
|
|
ESC08-00539
| BMP Violation | 6/15/2009 | 6/15/2009 | 6/15/2009 1:24:58 PM | P | FAIL |
|
|
Verbal to RP: Protect all disturbed area with some type ofv sediment bmps along Five Mile Rd. Protect the storm drain inlets within parking lot and the 1 storm drain at the corner of Five Mile and project area. Will re-inspect on 6/17/09.
|
ESC08-01043
| Site Preparation | 6/12/2009 | 6/15/2009 | 6/15/2009 11:49:34 AM | A | PART |
|
|
In the process of implimenting the BMP's per there erosion control plan.
|
ESC09-00286
| General Inspection | 6/15/2009 | 6/15/2009 | 6/15/2009 11:49:00 AM | P | PART |
|
|
Found that n the west end of project that the out fall from the runoff from the foothill subdivision was discharging turbid run off into the penn canal. Nothing was generated from any construction activies. Also the consultant and i observed a storm drain inlet on Barber rd needed to be protected. No major issues with any of the construction activies.
|
ESC07-01595
| Site Final | 6/9/2009 | 6/15/2009 | 6/11/2009 11:27:15 AM | A | PASS |
|
|
|