ESC10-00185
| General Inspection | 6/15/2010 | 6/15/2010 | 6/15/2010 3:18:27 PM | P | PASS |
|
|
Dewatering terminated: Backfilling being performed.
|
ESC09-00507
| Conference | 6/7/2010 | 6/15/2010 | 6/15/2010 2:38:00 PM | A | DONE |
|
|
Mike talked to owner about inspections and project conclusion? Talked to Mike and D. Briggs. Dean will contact out-of-state owner with information to contract erosion control maintenance until Phase II (Building of structure) will commence. Dean will send an e-mail to Boise City (SGW) for additional requirements and general ESC information which is required.
|
ESC10-00040
| General Inspection | 6/15/2010 | 6/15/2010 | 6/15/2010 2:06:34 PM | P | PART |
|
|
Verbal to RP: Need to post yellow sign at main construction entrance, double protect d.inlet at the north side of the project. Reviewed stabilization of project. Upon achieving final elevation 10 inches of top soil and seed broadcasted on site. Area will be fully sprinkled to achieve growth.
|
ESC09-00352
| General Inspection | 6/15/2010 | 6/15/2010 | 6/15/2010 1:08:25 PM | P | PASS |
|
|
Discharge continues from high Boise River flows impacting the upper end of the park. Discharge appears clear.
|
ESC10-00471
| Site Preparation | 6/15/2010 | 6/15/2010 | 6/15/2010 7:47:49 AM | | CANC |
|
|
Inspector 301 passed inspection on 6/11/10
|