FIR11-00219
| INSP-Conference | 6/15/2011 | 6/15/2011 | 6/15/2011 2:52:44 PM | P | DONE |
|
|
I spoke to Robert about duct detector placement.
|
FIR11-00190
| INSP-Final Inspection | 6/15/2011 | 6/15/2011 | 6/15/2011 1:56:39 PM | P | FAIL |
|
|
Provide annual inspection and provide testing for the alarm interconnections.
|
BLD11-01237
| FIRE-Final Inspection | 6/15/2011 | 6/15/2011 | 6/15/2011 1:56:00 PM | P | FAIL |
|
|
See the city approved plans for corrections marked in red. They include front and rear door hardware and providing annual inspection tags for the two fire extinguishers. Mary and Brian stated that they would also install lever hardware on the restroom door.
|
BLD11-01185
| FIRE-Conference | 6/15/2011 | 6/15/2011 | 6/15/2011 1:54:29 PM | P | DONE |
|
|
Tim Woodard and I went to the job site to see actual job conditions for wood working in the ware house.
|
FIR11-00285
| INSP-Sprinkler Rough-in | 6/14/2011 | 6/15/2011 | 6/15/2011 10:58:29 AM | A | PASS |
|
|
The stub out only is ok to cover. This piping was lowered to meet the city and state requirement of atleast 4'6" to top of piping for a minimum bury.
|