BLD15-01269
| BLD-Footing | 6/12/2015 | 6/15/2015 | 6/15/2015 3:36:37 PM | P | PART |
|
|
Dane Phone #: ###-####
|
BLD15-00484
| BLD-Framing/Rough-in | 6/15/2015 | 6/15/2015 | 6/15/2015 3:11:54 PM | P | FAIL |
|
|
Pat Phone #: ###-####. Repair holes in draft stop, firecaulk the membrane penetrations(tub and toilet) in floor ceiling assembly.
|
BLD15-00485
| BLD-Other | 6/15/2015 | 6/15/2015 | 6/15/2015 3:10:37 PM | P | PASS |
|
|
Rc1 channel - Pat Phone #: ###-####
|
BLD15-01373
| BLD-Energy code compliance | 6/15/2015 | 6/15/2015 | 6/15/2015 1:54:21 PM | P | PASS |
|
|
Insulation // John Phone #: ###-####
|
BLD15-01640
| BLD-Foundation | 6/15/2015 | 6/15/2015 | 6/15/2015 1:06:03 PM | P | PART |
|
|
Cal Phone #: ###-####
|
BLD15-01609
| BLD-Footing | 6/12/2015 | 6/15/2015 | 6/15/2015 10:23:23 AM | A | PASS |
|
|
Tim Phone #: ###-####
|
MIS15-00126
| BLD-Conference | 6/8/2015 | 6/15/2015 | 6/15/2015 9:25:24 AM | A | PASS |
|
|
Check status. Plans have been submitted and are under reveiw.
|
BLD15-00260
| BLD-Final | 6/12/2015 | 6/15/2015 | 6/15/2015 9:23:35 AM | A | NR |
|
|
Dan Phone #: ###-####. Needs plumbing final.
|
BLD13-03592
| BLD-Final | 6/12/2015 | 6/15/2015 | 6/15/2015 9:21:38 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Hildebrand. Ok for temp occ.
|