ELE12-01429
| ELE-Aging Inspection | 6/15/2016 | 6/15/2016 | 6/15/2016 3:39:30 PM | | PASS |
|
|
Still under construction
|
ELE16-01511
| Final | 6/14/2016 | 6/15/2016 | 6/15/2016 3:04:17 PM | P | FAIL |
|
|
James Phone #: ###-#### 314.20- Boxes mounted in walls with a combustible material shall be flush or have extension rings installed. 406.12- All receptacles installed in a residence shall be tamper resistant type. In cabinets and pop-ups. Informed contact who is general foreman
|
ELE16-01892
| Permanent Service | 6/15/2016 | 6/15/2016 | 6/15/2016 12:47:47 PM | P | PASS |
|
|
meyers cabinet on south east corner of lot for street lights on eastside of lot Phone #: ###-#### Inspection requested via web by Celinda Winters p/s u/g n ok
|
ELE15-01303
| Electrical Rough-In | 6/14/2016 | 6/15/2016 | 6/15/2016 11:33:36 AM | A | PASS |
|
|
Please call 30 minutes in advance as no-one is on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton 406, 407 drop lids rough in ok cover
|
ELE16-00329
| Electrical Rough-In | 6/14/2016 | 6/15/2016 | 6/15/2016 11:01:17 AM | A | PASS |
|
|
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton All room on N.E. side of main corridor grid rough in ok cover
|
ELE16-01513
| Electrical Rough-In | 6/14/2016 | 6/15/2016 | 6/15/2016 10:18:32 AM | A | PASS |
|
|
2nd floor opposite the convention rooms. Asher Sears is the electrician onsite Phone #: ###-#### Inspection requested via web by steve ragan Asked contact to check weight rating of ceiling system and to research and assign ELE permit to BLD permit. Walls and hardlid rough in ok cover
|
ELE16-00702
| Permanent Service | 6/14/2016 | 6/15/2016 | 6/15/2016 9:41:28 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Celinda Winters Request was for a meyers cabinet on south east corner of lot for street lights on eastside of lot. Requires seperate permit.
|
ELE16-01825
| Rough-In Permanent Service | 6/14/2016 | 6/15/2016 | 6/15/2016 9:04:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson Rough in ok cover p/s u/g n ok
|
ELE16-01134
| Electrical Rough-In | 6/14/2016 | 6/15/2016 | 6/15/2016 12:00:00 AM | A | PASS |
|
|
We are requesting a 3rd floor south 1/2 of slab rough-in inspection for tomorrow 6/15/16 in the afternoon. Our contact is Bobby @ ###-####.
Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate 3rd floor as noted and marked on contractor print rough in ok cover.
|