BLD16-00459
| BLD-Conference | 6/15/2016 | 6/15/2016 | 6/16/2016 6:50:08 AM | P | DONE |
|
|
Bill Phone #: ###-####
|
BLD15-03940
| BLD-Framing/Rough-in | 6/15/2016 | 6/15/2016 | 6/16/2016 6:49:34 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Michael Dempsey
|
BLD15-04022
| BLD-Foundation | 6/15/2016 | 6/15/2016 | 6/16/2016 6:49:08 AM | P | PASS |
|
|
Ben Phone #: ###-####
|
BLD15-02855
| BLD-Final | 6/14/2016 | 6/15/2016 | 6/15/2016 1:44:11 PM | P | NR |
|
|
Rod; Phone #: ###-#### needs c/n items completed and zoning final
|
BLD16-00973
| BLD-Final | 6/15/2016 | 6/15/2016 | 6/15/2016 1:20:11 PM | P | PART |
|
|
verify demolition; Carlos Phone #: ###-#### houses has been removed but foundations still in place along with driveways
|
BLD16-00707
| BLD-Footing | 6/14/2016 | 6/15/2016 | 6/15/2016 12:57:00 PM | A | PASS |
|
|
Robert Phone #: ###-####
|
BLD15-04191
| BLD-Final | 6/14/2016 | 6/15/2016 | 6/15/2016 10:28:28 AM | A | PART |
|
|
Please call ahead for access - Darren Phone #: ###-#### walked 3rd and 4th floors ok for occ also 5th and 6th are ok in basement need to change door swing on hallway doors out of class rooms area olso double exit doors out of auditorium need to met ansi 97.1 saftey glassind standerds.
|
BLD14-02889
| BLD-Ceiling Grid Inspection | 6/14/2016 | 6/15/2016 | 6/15/2016 9:32:41 AM | A | PASS |
|
|
Hard lid and fire caulking units 406 ; 407. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD16-00666
| BLD-Framing/Rough-in | 6/15/2016 | 6/15/2016 | 6/15/2016 8:59:47 AM | A | CANC |
|
|
Mech shaft framing. Please call Nic 1/2 hr before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen part basement walls ok to cover
|
BLD16-00280
| BLD-Aging Inspection | 6/15/2016 | 6/15/2016 | 6/15/2016 6:57:26 AM | | PEND |
|
|
|
BLD16-01323
| DOC - Permit Finaled | 6/15/2016 | 6/15/2016 | 6/15/2016 6:54:11 AM | A | PASS |
|
|
|