FIR16-00253
| INSP-Final Inspection | 6/15/2016 | 6/15/2016 | 6/15/2016 11:54:54 AM | P | PASS |
|
|
permit finaled
|
BLD15-04323
| FIRE-Final Inspection | 6/14/2016 | 6/15/2016 | 6/15/2016 11:24:38 AM | A | PASS |
|
|
life safety passed
|
FIR16-00282
| INSP-Sprinkler Rough-in | 6/14/2016 | 6/15/2016 | 6/15/2016 8:45:48 AM | A | PASS |
|
|
The tenting passed for the north half of the third floor. Piping for the north half of the third floor is ok to cover. Included piping crossing the breeze way.
|