BLD00-00981
| FIRE-Final Inspection | 6/16/2000 | 6/16/2000 | 6/16/2000 12:00:00 AM | A | PASS |
|
|
update of records - final okay
|
BLD00-00848
| FIRE-Conference | 6/16/2000 | 6/16/2000 | 6/16/2000 12:00:00 AM | A | PART |
|
|
met contractor on 6/15 and discussed occupant loads. told tehm to follow the approved or they will have to resubmit to change the occupancy type for the upstair area
|
BLD00-00728
| FIRE-Conference | 6/16/2000 | 6/16/2000 | 6/16/2000 12:00:00 AM | A | PART |
|
|
met contractor and Joe Larose - reviewed plans; matting was in place where tanks are to be installed and overlap of mat is okay at seam areas. Access road will widened to 20 ft per Dave miller. No new hydrants are planned. Dave Miller was unavailable for this inspection.
|