FIR03-00067
| FIR-Aging Inspection | 6/16/2003 | 6/16/2003 | 6/16/2003 12:00:00 AM | | PART |
|
|
work is still in progress 6/16/2003 9:48:08 AM
|
FIR03-00296
| INSP-Sprinkler Rough-in/Hydro | 6/13/2003 | 6/16/2003 | 6/16/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 2:50:21 PM. Contact: ###-####. okay to cover arched area in elevator lobby; the rest of the lobby to be completed later per Mick; the rest of the permitted area isn't ready or complete 6/16/2003 9:49:39 AM
|
BLD03-00402
| FIRE-Final Inspection | 6/13/2003 | 6/16/2003 | 6/16/2003 12:00:00 AM | A | FAIL |
|
|
DON; Phone #: ###-#### Internet Inspection Request from: Darla Downs repair east and north exit signs; extinguisher needed; verify air handler - if over 2000 CFM then detectors required; need doors installed to verify hardware; address needed 6/16/2003 10:50:52 AM
|
BLD03-00175
| FIRE-Final Inspection | 6/16/2003 | 6/16/2003 | 6/16/2003 12:00:00 AM | P | FAIL |
|
|
ERNIE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIR03-00227
| INSP-Final Inspection | 6/16/2003 | 6/16/2003 | 6/16/2003 12:00:00 AM | P | PASS |
|
|
treasure valley fire protection overhead; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIR03-00264
| INSP-Sprinkler Rough-in | 6/16/2003 | 6/16/2003 | 6/16/2003 12:00:00 AM | P | PASS |
|
|
sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIR03-00144
| INSP-Sprinkler Rough-in/Hydro | 6/16/2003 | 6/16/2003 | 6/16/2003 12:00:00 AM | P | FAIL |
|
|
4 inch needs additional EQ
|