BLD04-01298
| BLD-Aging Inspection | 6/16/2005 | 6/16/2005 | 6/20/2005 3:12:26 PM | P | DONE |
|
|
Spoke with Russ at ###-####, who refered me to Jerry Weaver at ###-#### whom I contacted and left a message in regards to the aging permit and the need for a final inspection and sign off.
|
FIR05-00265
| INSP-Sprinkler Rough-in | 6/16/2005 | 6/16/2005 | 6/16/2005 4:33:50 PM | P | FAIL |
|
|
Underground piping must meet min. depth of bury req. NFPA 10.4.1, backfill at rock per 10.9.4, support per 10.7.9, distance from embankment per 10.5.4, and meet deflection requirements. The pipe laid over the large section of embeded rock in the trench fails to meet code standards and requirements.
|
FIR05-00272
| INSP-Supply line flush | 6/15/2005 | 6/16/2005 | 6/16/2005 4:17:11 PM | P | FAIL |
|
|
Installation does not match approved plans, pipe routing has been changed significantly.
|
BLD04-00313
| FIRE-Final Inspection | 6/15/2005 | 6/16/2005 | 6/16/2005 2:09:39 PM | P | FAIL |
|
|
Provide current inspection tag on installed fire ext., provide sinage above main entry/ exit door.
|
FIR05-00282
| INSP-Sprinkler Rough-in/Hydro | 6/16/2005 | 6/16/2005 | 6/16/2005 1:22:42 PM | P | CANC |
|
|
Wrong permit number called in. This inspection was for UG hydro and flush under permit fir05-00206 at the same address under the same building permit.
|
FIR05-00045
| INSP-Supply line flush | 6/14/2005 | 6/16/2005 | 6/16/2005 12:22:46 PM | A | PART |
|
|
Underground fire supply line hydro and flush both passed inspection.
|
FIR05-00344
| INSP-Sprinkler Rough-in/Hydro | 6/16/2005 | 6/16/2005 | 6/16/2005 12:01:58 PM | P | PART |
|
|
Beam clamps and retaining straps on hangers in theaters verified, two hangers missing straps and one hanger with strap not attatched to beam....these hangers were corrected while on site.
|
FIR05-00160
| INSP-Final Inspection | 6/16/2005 | 6/16/2005 | 6/16/2005 11:23:24 AM | P | PASS |
|
|
Fire sprinkler finaled, Troy Cobbley has tested the flow switch during alarm testing under the associated fire alarm permit fir05-00232.
|
BLD04-00094
| FIRE-Final Inspection | 6/14/2005 | 6/16/2005 | 6/16/2005 10:35:27 AM | A | PART |
|
|
Life safety issues passed inspection, final pending sign off on sprinkler permit fir05-00160 (flow switch test).
|
BLD05-01107
| FIRE-Conference | 6/15/2005 | 6/16/2005 | 6/16/2005 8:27:57 AM | A | DONE |
|
|
Discussed emergency lighting placement and exit sign locations with Tim the GC and electrical contractor.
|
BLD04-00094
| FIRE-Final Inspection | 6/16/2005 | 6/16/2005 | 6/16/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled.
|
FIR05-00206
| INSP-Sprinkler Rough-in/Hydro | 6/16/2005 | 6/16/2005 | 6/16/2005 12:00:00 AM | P | PASS |
|
|
Underground fire supply line hydrostatic test and flush passed inspection.
|
MIS04-00258
| BLD-Final | 6/16/2005 | 6/16/2005 | 6/16/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled.
|