ELE06-00319
| ELE-Aging Inspection | 6/16/2006 | 6/16/2006 | 6/16/2006 4:18:01 PM | | DONE |
|
|
project is suc.
|
ELE06-02210
| Temporary Service | 6/16/2006 | 6/16/2006 | 6/16/2006 4:04:49 PM | P | PASS |
|
|
joe - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley corr made, t/s u/g n ok
|
ELE06-02209
| Temporary Service | 6/16/2006 | 6/16/2006 | 6/16/2006 4:02:05 PM | P | PASS |
|
|
joe - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley corr made, t/s u/g n ok
|
ELE06-00457
| Final | 6/16/2006 | 6/16/2006 | 6/16/2006 3:48:49 PM | P | PART |
|
|
rock; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called contr to say core and shell must be finalled before t/l. Told contr labels required for panels, rest ok
|
ELE06-00784
| Final | 6/16/2006 | 6/16/2006 | 6/16/2006 3:07:43 PM | P | PASS |
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr made, ok to final
|
ELE06-02236
| Electrical Rough-In | 6/16/2006 | 6/16/2006 | 6/16/2006 2:15:42 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/16/2006 at 11:28:08 AM. Contact: ###-####. ok to cover u/g
|
ELE06-02229
| Rough-In Permanent Service | 6/16/2006 | 6/16/2006 | 6/16/2006 1:46:28 PM | P | FAIL |
|
|
verna; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called, left corr notice, nec 300.4(A)&(D) edge of holes and nm cable shall be 1 1/4" from edge of framing members,BCC all make-up shall be done, boxes installed
|
ELE06-02208
| Electrical Rough-In | 6/16/2006 | 6/16/2006 | 6/16/2006 1:15:32 PM | P | PASS |
|
|
joe - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley corr made, ric ok, p/s u/g n ok
|
ELE06-01922
| Electrical Rough-In | 6/15/2006 | 6/16/2006 | 6/16/2006 12:07:15 PM | A | PASS |
|
|
Equal potential plane for hot tub; Phone #: ###-#### Internet Inspection Request from: Jari Rivers ok to pour for hot tub
|
ELE06-02216
| Rough-In Permanent Service | 6/15/2006 | 6/16/2006 | 6/16/2006 11:55:27 AM | A | PASS |
|
|
lynn ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ric ok, p/s u/g n ok
|
ELE06-00113
| Electrical Rough-In | 6/15/2006 | 6/16/2006 | 6/16/2006 10:25:44 AM | A | PART |
|
|
contact: Greg Pack - 5th floor inspection; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 5th walls, 5-11 #1 stairwells anop ok to cover
|
ELE06-02142
| Rough-In Permanent Service | 6/16/2006 | 6/16/2006 | 6/16/2006 10:03:12 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 6/16/2006 at 6:56:45 AM. Contact: ###-####. will call for ltr
|
ELE06-01464
| Final | 6/15/2006 | 6/16/2006 | 6/16/2006 9:21:56 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/15/2006 at 4:19:45 PM. Contact: ###-####. corr made, ok to final
|
ELE06-02225
| Rough-In Permanent Service | 6/15/2006 | 6/16/2006 | 6/16/2006 8:56:32 AM | A | FAIL |
|
|
dino; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called, left corr notice,nec 250.64(C)&(D) gec shall be continuous or tapped outside enclosure, 300.4(A)&(D) edge of holes and nm cable shall be 1 1/4" from edge of framing member, 334.23 nm cable shall comply with 320.23 in attic space, BCC all make-up shall be done,boxes installed,approved set of plans on job. Note: 38 rooms
|