ESC06-00005
| Aging Inspection | 6/16/2008 | 6/16/2008 | 6/17/2008 4:38:23 PM | | DONE |
|
|
site is still active. Not threats seen. CAS #460
|
ESC07-01246
| Random Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 4:10:47 PM | P | PART |
|
|
Need to dress up entrance off of Longmont CAS #460
|
ESC07-01389
| BMP Violation | 6/13/2008 | 6/16/2008 | 6/16/2008 4:01:09 PM | P | PASS |
|
|
All issues dealt that were pertaining with Notices that were posted. CAS #460
|
ESC08-00173
| General Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 3:30:14 PM | P | FAIL |
|
|
Verbal Notice. 1. Need to protect all d.i. and irragation grids. 2. Install construction entrance. Spoke with RP over the issues pertaining with the notice. Will re-inspect on 6/17/08 in the PM CAS #460
|
ESC03-00857
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 3:00:01 PM | P | PASS |
|
|
All work is complete. Final landscaping is installed. CAS #460
|
ESC07-01262
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 2:56:59 PM | P | PASS |
|
|
All work is complete. Final landscaping is installed. CAS #460
|
ESC07-01517
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 2:56:16 PM | P | PASS |
|
|
All work is complete. Final landscaping is installed. CAS #460
|
ESC07-00211
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 2:55:29 PM | P | PASS |
|
|
All work is complete. Final landscaping is installed. CAS #460
|
ESC07-01212
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 2:55:02 PM | P | PASS |
|
|
All work is complete. Final landscaping is installed. CAS #460
|
ESC05-02071
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 2:29:50 PM | P | PASS |
|
|
All work has been completed. CAS #460
|
ESC06-00001
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 2:09:20 PM | P | PASS |
|
|
All work has been completed. CAS #460
|
ESC07-01387
| Random Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 2:01:54 PM | P | PASS |
|
|
Site is kept up good. No issues present. CAS #460
|
ESC07-01386
| Random Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 2:01:25 PM | P | PASS |
|
|
Site is kept up good. No issues present. CAS #460
|
ESC08-00465
| General Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 1:55:28 PM | P | FAIL |
|
|
Due to the back fill of footings there is dirt along the sidewalks and street. Contractoe said they wil clean it up. Will re-inspect on 6/17/08 in the PM. CAS #460
|
ESC08-00363
| Site Preparation | 6/13/2008 | 6/16/2008 | 6/16/2008 1:47:46 PM | A | PART |
|
|
Need to re-design the washout pit area at the east of the school. CAS #460
|
ESC08-00440
| Site Preparation | 6/13/2008 | 6/16/2008 | 6/16/2008 1:24:23 PM | A | DONE |
|
|
Work will not start until 6/22/08 and sign will be posted at that time. Went over the concerns with the RP will re-inspect on 6/23/08 in the PM. CAS #460
|
ESC05-02068
| Aging Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 1:10:09 PM | | DEFR |
|
|
Moved to a site final CAS #460
|
ESC05-02068
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 1:09:44 PM | P | PASS |
|
|
All work completed. CAS #460
|
ESC08-00502
| Site Preparation | 6/13/2008 | 6/16/2008 | 6/16/2008 11:39:38 AM | A | DEFR |
|
|
Work completed. Moved to a site final. CAS #460
|
ESC08-00502
| Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 11:39:27 AM | P | PASS |
|
|
Work completed. CAS #460
|
ESC08-00477
| INSP - Stop Work Order | 6/16/2008 | 6/16/2008 | 6/16/2008 9:58:10 AM | A | PASS |
|
|
All issues have been dealt with. Stop work has been pulled. CAS #460
|
ESC08-00193
| INSP - Stop Work Order | 6/16/2008 | 6/16/2008 | 6/16/2008 9:12:00 AM | A | PASS |
|
|
All issues dealt with. Stop work has been pulled. CAS #460
|
ESC08-00525
| Site Preparation | 6/13/2008 | 6/16/2008 | 6/16/2008 8:06:09 AM | A | PASS |
|
|
Site is contained. Site is looking good. They are enclosing the irragation channel into a pipe and have been working with the canal district on completing it. Water is off til Wensday. They will be complete by Wensady. CAS #460
|