BLD09-00374
| BLD-Conference | 6/16/2009 | 6/16/2009 | 6/17/2009 11:51:48 AM | P | PASS |
|
|
Tim Phone #: ###-#### ?s on handrail
|
BLD09-00930
| BLD-Framing/Rough-in | 6/16/2009 | 6/16/2009 | 6/17/2009 9:09:19 AM | P | PART |
|
|
Sean Phone #: ###-####, verify wired in smoke detectors at final,, need firestop at top of chase
|
BLD05-01143
| BLD-Conference | 6/15/2009 | 6/16/2009 | 6/17/2009 9:04:39 AM | A | FAIL |
|
|
expired..
|
BLD08-01593
| BLD-Final | 6/16/2009 | 6/16/2009 | 6/16/2009 4:09:47 PM | P | PASS |
|
|
Doug-please call at least 1/2 hour prior to inspection for access Phone #: ###-####
|
BLD08-01593
| DOC - Permit Finaled | 6/16/2009 | 6/16/2009 | 6/16/2009 4:09:12 PM | P | PASS |
|
|
c of c issued
|
BLD09-00604
| BLD-Framing/Rough-in | 6/15/2009 | 6/16/2009 | 6/16/2009 2:09:24 PM | A | PASS |
|
|
mike Phone #: ###-#### ok to insulate
|