Inspections for the day of: Tuesday, June 16, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00323 Site Preparation6/16/20096/16/20096/16/2009 3:56:08 PMPPASS
ESC05-01446 DOC - Permit Finaled6/16/20096/16/20096/16/2009 3:37:31 PMPPASS
ESC09-00229 Random Inspection6/16/20096/16/20096/16/2009 3:23:38 PMPPASS
ESC05-00759 DOC - Permit Finaled6/16/20096/16/20096/16/2009 3:08:39 PMPPASS
ESC09-00262 Random Inspection6/16/20096/16/20096/16/2009 3:05:07 PMPPASS
ESC09-00225 Tracking Control6/16/20096/16/20096/16/2009 2:01:16 PMPFAIL
Verbal to RP:
CLean up all tracking off of Irving onto Maple Grove. Will re-inspect on 6/17/09 AM.
ESC08-00952 BMP Violation6/12/20096/16/20096/16/2009 1:44:44 PMAFAIL
Correction Notice: (Message to RP)
1. Clean up concrete spoil pile at the south end of project area.
2. Block off access point or stabilize it with an approved stabilized construction exit.
** Failure to comply will result in a Stop Work Order**
Will re-inspect on 6/18/09 AM
ESC08-00924 Random Inspection6/16/20096/16/20096/16/2009 1:42:11 PMPFAIL
Verbal to RP:
Provide the ESC sign at the front of the lift station, not within the inside of thelift station.
ESC09-00086 General Inspection6/16/20096/16/20096/16/2009 1:37:50 PMPCANC
ESC09-00303 Site Preparation6/16/20096/16/20096/16/2009 11:09:17 AM PART
Grader will install a concrete washout pit today. All sediment on sidewalk will be cleaned up at the end of the day.
ESC09-00305 Site Preparation6/16/20096/16/20096/16/2009 11:08:59 AM PART
Grader will install a concrete washout pit today. All sediment on sidewalk will be cleaned up at the end of the day.
ESC07-00986 BMP Violation6/15/20096/16/20096/16/2009 11:08:02 AMADONE
Went over issues with RP at the project. Will be cleaned up and a relief trench of good size will be excavated out to pervent anymore runoff to occur. Will re-inspect on 06/17/09.
ESC05-01341 Conference6/16/20096/16/20096/16/2009 9:20:52 AMADONE
Went over the provision that are required by the city of Boise for the process of transfering over permits within the parcel. Spoke with Layton with Benchmark Const. Also gave him the information to contact the EPA over the permit for the transfer of information also. Will re-inspect once contacted by Benchmark prior to the start of work to go over that all transfering has been completed and certain provisions will be utilized for work needs to occur to complete the project.