ELE10-00372
| ELE-Aging Inspection | 6/16/2010 | 6/16/2010 | 6/18/2010 6:41:26 AM | | DONE |
|
|
see final
|
ELE10-00194
| ELE-Aging Inspection | 6/16/2010 | 6/16/2010 | 6/18/2010 6:39:59 AM | | DONE |
|
|
suc
|
ELE09-02094
| ELE-Aging Inspection | 6/16/2010 | 6/16/2010 | 6/18/2010 6:34:32 AM | | DONE |
|
|
see final
|
ELE10-01286
| Electrical Rough-In | 6/16/2010 | 6/16/2010 | 6/17/2010 9:41:47 AM | P | FAIL |
|
|
steve Phone #: ###-#### called, left correction notice, NEC 210.52 shall add receptacles for 2' wall spacing at garage main landing, downstairs bar, living room divider,3110.4(D) sahll provide 1 1/4" protection for nm cable, 1120.26(F)(1) there shall be no foreign systems (piping) over dedicated space at panels, NOTE corrections shall be made within 5 working days or further action will be taken
|
ELE10-01305
| Electrical Rough-In | 6/16/2010 | 6/16/2010 | 6/17/2010 8:00:52 AM | P | PART |
|
|
Inspection requested from web by: Jon Gleason Phone #: ###-#### ri 3areas only ok
|
ELE08-01642
| ELE-Aging Inspection | 6/16/2010 | 6/16/2010 | 6/17/2010 6:31:56 AM | | DONE |
|
|
no activity, see doc expire
|
ELE08-01658
| ELE-Aging Inspection | 6/16/2010 | 6/16/2010 | 6/17/2010 6:30:13 AM | | DONE |
|
|
see final
|
ELE07-03910
| ELE-Aging Inspection | 6/16/2010 | 6/16/2010 | 6/17/2010 6:26:02 AM | | DONE |
|
|
see doc expire
|
ELE07-03817
| ELE-Aging Inspection | 6/16/2010 | 6/16/2010 | 6/17/2010 6:24:42 AM | | DONE |
|
|
see doc expire
|
ELE10-01275
| Electrical Rough-In | 6/16/2010 | 6/16/2010 | 6/16/2010 3:47:46 PM | P | PASS |
|
|
Please inpsect concrete covering grounding electrode Inspection requested from web by: Shaun Kirkman Phone #: ###-#### ok to backfill concreter encased electrode
|
ELE10-00989
| Final | 6/16/2010 | 6/16/2010 | 6/16/2010 2:50:49 PM | P | PASS |
|
|
dino - please call for access Phone #: ###-#### called, ok to final
|
ELE10-01328
| Electrical Rough-In | 6/16/2010 | 6/16/2010 | 6/16/2010 1:55:39 PM | P | FAIL |
|
|
Dustin Croft is our contact for the site. Inspection requested from web by: David Oliver Phone #: ###-#### called, left correction notice, NEC 334.23, shall protect cable within 6' of attic access, 210.52 shall provide receptacle in 2' wall by stairs, 300.4(A) edge of bored holes shall be 1 1/4" from edge of framing members, 314.20 in combustible material, boxes shall be flush with finished surface, 210.52(E)(1) shall install receptacle at back of dwelling, BCC shall provide minimum 15"x20" access hole to jetted tub per instructions, NOTE corrections shall be made within 5 working days or further action will be taken
|
ELE10-01023
| Final | 6/15/2010 | 6/16/2010 | 6/16/2010 1:02:16 PM | P | PASS |
|
|
Richard-added a room-garage Phone #: ###-#### ok to final
|
ELE10-01318
| Electrical Rough-In | 6/16/2010 | 6/16/2010 | 6/16/2010 12:18:58 PM | P | PASS |
|
|
I have the key, I''ll be there between 10am and noon. Inspection requested from web by: Andy Derrick Phone #: ###-#### ric ok
|
ELE10-01318
| Final | 6/16/2010 | 6/16/2010 | 6/16/2010 12:18:49 PM | P | PASS |
|
|
I have the key, I''ll be there between 10am and noon. Inspection requested from web by: Andy Derrick Phone #: ###-#### ok to final
|
ELE10-01309
| Conference | 6/15/2010 | 6/16/2010 | 6/16/2010 10:41:40 AM | A | DONE |
|
|
mitch Phone #: ###-#### reviewed service and work in progress, contractor will upgrade garage feeder and grounding
|
ELE10-01074
| Electrical Rough-In | 6/15/2010 | 6/16/2010 | 6/16/2010 10:21:58 AM | A | PASS |
|
|
Chad-Floor heat inspection Phone #: ###-#### ok to cover floor heat only, called, will work on service and call for inspection
|
ELE10-01075
| Final | 6/15/2010 | 6/16/2010 | 6/16/2010 9:46:13 AM | A | FAIL |
|
|
Inspection requested from web by: david bradshaw Phone #: ###-#### called, left message, NEC 408.4 shall make panel schedule fully explanatory, BCC shall finish or blank stage receptacles, firmly attach plug mold, finisha stage lighting,upstairs receptacles shall operate, install seismic wires for fixtures, NOTE: corrections shall be made in 5 working days or further action will be taken
|
ELE10-00893
| Final | 6/16/2010 | 6/16/2010 | 6/16/2010 9:17:41 AM | A | PASS |
|
|
GARAGE CODE 1968 THANKS, BILL Inspection requested from web by: Bob Glenn Phone #: ###-#### ok to final
|
ELE10-01311
| Temporary Service | 6/15/2010 | 6/16/2010 | 6/16/2010 8:46:32 AM | A | PASS |
|
|
THANKS Inspection requested from web by: Bob Glenn Phone #: ###-#### t/s u/g n ok
|
ELE10-01313
| Electrical Rough-In | 6/15/2010 | 6/16/2010 | 6/16/2010 8:21:35 AM | A | PASS |
|
|
ready for trench inspection Inspection requested from web by: gary batten Phone #: ###-#### ok to cover trench
|
ELE10-01312
| Electrical Rough-In | 6/15/2010 | 6/16/2010 | 6/16/2010 8:21:03 AM | A | PART |
|
|
ready inspection Inspection requested from web by: gary batten Phone #: ###-#### met contractor, will call for p/s later, grounding ok
|