ESC10-00358
| Site Preparation | 6/16/2010 | 6/16/2010 | 6/16/2010 2:48:15 PM | P | NR |
|
|
No work noticed.
|
ESC10-00010
| General Inspection ESC | 6/16/2010 | 6/16/2010 | 6/16/2010 11:25:34 AM | | PART |
|
|
Verbal to RP: Construction entrances (2) needs to be maintained including correct types of material and the one off of Barber needs widened. Discussed final stabilization. Around ponds topsoil is in place and other misc. areas topsoil is being placed. Power service to site is needed to run irrigation, this issue is being worked. As soon as power is in place then seeding can be done and watering will cause growth. Old sediment barriers are expected to be removed if no longer needed.
|