Inspections for the day of: Monday, June 16, 2014.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00440 INSP-Sprinkler Rough-in6/9/20146/9/2014 P 
Terry at phone #: ###-####
FIR13-00440 INSP-Sprinkler Rough-in6/16/20146/16/20146/16/2014 3:52:58 PMPPART
!st floor main at entry vestibule, 2nd floor girid ceiling above west stairway as marked and dated on plans approved for cover.
FIR14-00322 INSP-Final Inspection6/13/20146/16/20146/16/2014 3:48:33 PMPPASS
Scope of work completed and passed both rough-in and final inspections. Permit finaled.
BLD14-01606 FIRE-Conference6/16/20146/16/20146/16/2014 3:40:57 PMPDONE
Regarding life safety items, trade related inspections, and conditions for occupancy.
BLD14-00867 FIRE-Final Inspection6/13/20146/16/20146/16/2014 3:32:52 PMADONE
Regarding conditions for occupancy, life safety items, trade related inspections, etc.
BLD14-01606 FIRE-Final Inspection6/12/20146/16/20146/16/2014 12:30:13 PMAPASS
Fire life safety passed provided approved door hardware is installed at the main entry/exit as discussed prior to structural final.
BLD14-00549 FIRE-Final Inspection6/13/20146/16/20146/16/2014 12:26:57 PMAPASS
Fire life safety inspection completed satisfactory.