ELE15-01541
| Final | 6/16/2015 | 6/16/2015 | 6/16/2015 3:53:59 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Karl Paige Not all luminaires have support wires at opposing corners. NEC 300.11 Fixture whips shall be supported off ceiling grid. NEC 348.30 FMC metal raceways shall be supported NE 800.25 Shall remove all abandoned cables and conduit
|
ELE15-01617
| Electrical Rough-In | 6/16/2015 | 6/16/2015 | 6/16/2015 2:25:24 PM | P | PASS |
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok cover underground service feeders to location of stub-ups
|
ELE15-01303
| Electrical Rough-In | 6/16/2015 | 6/16/2015 | 6/16/2015 1:56:37 PM | P | PASS |
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok pour basement interior walls
|
ELE14-03246
| Electrical Rough-In | 6/15/2015 | 6/16/2015 | 6/16/2015 11:56:51 AM | A | PART |
|
|
Levi. Tower #1 Partial Final units #4 Phone #: ###-#### Inspection requested via web by Sean DeLacy partial final rooms 430 thur 437
|
MIS15-00133
| ELE-Final | 6/15/2015 | 6/16/2015 | 6/16/2015 10:31:15 AM | A | PASS |
|
|
correction completed, final ok
|
ELE15-02132
| Conference | 6/15/2015 | 6/16/2015 | 6/16/2015 12:00:00 AM | A | DONE |
|
|
Discuss possibility of final on half of the residential units by August 15 and the other half at a later date. Phone #: ###-#### Inspection requested via web by Rafael Castillo Temporary occupancy would require approval from Project Management Ron Hill and Fire Marshall Romeo Gervais
|
ELE15-02132
| Electrical Rough-In | 6/15/2015 | 6/16/2015 | 6/16/2015 12:00:00 AM | A | PASS |
|
|
4th floor corridors, soffit ceilings (drops in units). Phone #: ###-#### Inspection requested via web by Rafael Castillo Rough-in ok cover
|