Inspections for the day of: Tuesday, June 16, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00317 BMP Violation6/16/20156/16/20156/18/2015 9:58:14 AMPFAIL
Inspection to verify corrections have been made issued to subcontractor onsite at 8:50am

4th Attempt trying to get ahold of RP Bill via phone with no Response. Attempted to contact GC Todd Campbell with same result. Left VM stating is issue isn't cleaned up today by 3pm, I will issue a Stop Work Order on the site until corrections/violations are addressed. Will follow up at 3pm today
ESC14-00868 General Inspection6/16/20156/16/20156/16/2015 2:10:02 PM PEND
ESC14-01025 General Inspection6/16/20156/16/20156/16/2015 1:59:27 PM PASS
No Issues at this time
ESC15-00673 Site Preparation6/16/20156/16/20156/16/2015 12:37:54 PMPPASS
Permit Posted and BMP's installed per site map.
Approved for Construction
ESC15-00673 General Inspection6/16/20156/16/20156/16/2015 12:36:50 PMPCANC
Jason Phone #: ###-####

Data Entry Error: Supposed to be a Site Prep Inspection
ESC15-00295 Site Final6/16/20156/16/20156/16/2015 11:59:57 AMPPASS
ESC15-00295 DOC - Permit Finaled6/16/20156/16/20156/16/2015 11:59:50 AMPPASS
Project Complete
ESC Conditions Satisfied
ESC15-00295 Site Preparation6/16/20156/16/20156/16/2015 11:55:33 AMPCANC
Jason Phone #: ###-####
Data Entry Error
Supposed to be a Site Final Inspection
ESC14-00403 Aging Inspection6/16/20156/16/20156/16/2015 11:41:54 AM PASS
ESC14-01011 General Inspection6/16/20156/16/20156/16/2015 10:39:51 AM PASS
No issues observed at this time
ESC14-00944 General Inspection6/16/20156/16/20156/16/2015 9:52:51 AM PEND
Minor WIP: Waiting for Perm Vegetation establishment to take effect
ESC15-00037 Random Inspection6/16/20156/16/20156/16/2015 9:39:33 AMAFAIL
Significant Trackout Throughout Woodland Dr. Contacted TJ and he stated he will get the road and sidewalks swept up asap. Will follow up on a later date this week
ESC14-00880 Aging Inspection6/16/20156/16/20156/16/2015 9:28:44 AM PEND
Remove Foundation prior to ESC permit being closed. BLD still open
ESC15-00632 Site Preparation6/15/20156/16/20156/16/2015 9:26:07 AMAPART
Chris Phone #: ###-####

Grading for foundation already commenced prior to site prep inspection. Disclosed to Subcontractor/Excavator to question the builder if a site prep has been conducted and approved prior to earth disturbance. He stated he will.
Permit Posted.
Some trackout occuring from dumptruck. Disclosed to sweep tires off prior to entering street and sweep after each working day
ESC15-00317 Complaint Inspection6/16/20156/16/20156/16/2015 8:58:06 AMAFAIL
Dumping Solvents/Paint into un-lined washout near neighbors well

Attempted to contact RP Bill to disclose subcontractors dumping paints and solvents in a un-lined hole in the ground. There is also a black tar looking substance that has been dumped on the ground as well. Attempted 3 phone calls to Bill with no Response. Talked with a sub onsite and he stated he will shovel out the illicit discharges and place into the dumpster. Will follow up this afternoon with another inspection to verify the corrections have been made.
ESC14-00885 General Inspection6/16/20156/16/20156/16/2015 7:19:12 AM PASS
ESC14-00885 DOC - Permit Finaled6/16/20156/16/20156/16/2015 7:19:05 AMAPASS
Vegetation Re-established
ESC Conditions Satisfied