BLD15-04191
| BLD-Ceiling Grid Inspection | 6/15/2016 | 6/16/2016 | 6/17/2016 6:37:16 AM | P | PASS |
|
|
Darren Phone #: ###-#### first floor
|
BLD16-01746
| BLD-Foundation | 6/16/2016 | 6/16/2016 | 6/17/2016 6:35:05 AM | P | PASS |
|
|
Rebar pool // Steve Phone #: ###-####
|
BLD15-04022
| BLD-Footing | 6/16/2016 | 6/16/2016 | 6/17/2016 6:34:19 AM | P | CANC |
|
|
Phone #: ###-####
|
BLD14-03207
| BLD-Conference | 6/16/2016 | 6/16/2016 | 6/16/2016 2:49:19 PM | P | PART |
|
|
Adam- ###-#### 9th floor columns ok to cover
|
BLD16-01501
| BLD-Ceiling Grid Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 2:46:58 PM | P | PART |
|
|
Zach Phone #: ###-#### phase one ok to cover
|
BLD16-01501
| BLD-Conference | 6/16/2016 | 6/16/2016 | 6/16/2016 2:46:03 PM | P | DONE |
|
|
Zach Phone #: ###-####
|
BLD16-00707
| BLD-Foundation | 6/15/2016 | 6/16/2016 | 6/16/2016 10:48:17 AM | A | PASS |
|
|
Robert-would like as late AM as possible Phone #: ###-####
|
BLD16-00244
| BLD-Energy code compliance | 6/15/2016 | 6/16/2016 | 6/16/2016 10:32:31 AM | A | PART |
|
|
Bob-partial on 3rd floor insulation for sheet rock Phone #: ###-#### ceilings on 3rd floor hallways and comon areas ok to rock
|
BLD16-01527
| BLD-Foundation | 6/15/2016 | 6/16/2016 | 6/16/2016 10:30:42 AM | A | PART |
|
|
John Phone #: ###-#### first pour of a 3 part pour
|
BLD16-00476
| BLD-Wall cover | 6/15/2016 | 6/16/2016 | 6/16/2016 10:29:47 AM | A | PASS |
|
|
If no answer please call ###-#### Thank You Phone #: ###-#### Inspection requested via web by Rock Self
|