ELE20-01975
| Electrical Rough-In | 6/12/2020 | 6/16/2020 | 6/16/2020 2:49:17 PM | P | NR |
|
|
Bart Phone #: ###-#### Turned into conference. Discussed secure MN cable in center of 2x4 studs, nail plates, intersystem bond, changing to PVC nipple to simplify grounding, garage door receptacle, door bell wiring, pantry counter top receptacle requirements, well lockout, basement may be sheet rocked but to remain unfinished, smoke and carbon monoxide detector wiring, readily accessible GFCI devices for christmas ect., grounding electrode conductor installation, sub panel feeders.
|
ELE20-02030
| Permanent Service | 6/15/2020 | 6/16/2020 | 6/16/2020 1:42:04 PM | P | PASS |
|
|
Need an early afternoon inspection please so Idaho power can reconnect. Phone #: ###-#### Inspection requested via web by Eric Schroeder Existing main panel in basement will have seperated grounds and neutrals by final. p/s o/h rec ok
|
ELE20-01782
| Electrical Rough-In | 6/16/2020 | 6/16/2020 | 6/16/2020 1:16:03 PM | P | PASS |
|
|
Ceiling Rough In Inspection - Please contact Bruce when on-site for exact location(s).
Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL Checked all areas for final, only item was GFCI protection of disposal receptacles as per 210.8(B). Reception, break rm, phone rms grid rough in ok cover.
|
ELE20-02036
| Temporary Service | 6/16/2020 | 6/16/2020 | 6/16/2020 12:45:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley t/s o/h n ok
|
ELE20-02014
| Electrical Rough-In | 6/15/2020 | 6/16/2020 | 6/16/2020 11:31:18 AM | A | PASS |
|
|
Homeowner will be home. Phone #: ###-#### Inspection requested via web by Rodney Monroe Down powder bath remodel rough in ok cover
|
ELE19-00722
| Final | 6/15/2020 | 6/16/2020 | 6/16/2020 11:30:02 AM | A | FAIL |
|
|
screened // Tony Phone #: ###-#### 200.9- White conductor when used for other than grounded conductors shall be re-identified other than white. 210.8(A)- All receptacle outlets installed for bathroom vanities shall have GFCI protection. Master bath. 210.52(C)- Pantry counter top areas shall have receptacle outlets installed so that no point on counter is more than 24" from a receptacle outlet. 250.94- Inter systme bond shall be installed on north side of house. 314.16- Boxes shall be of sufficient size for conductors installed. 8 cubic inch box installed for island counter receptacle with 11.25 cubic inches of conductor installed. 348.30- Metal flex for disposal shall be secured by approved means with in 12" of box. 406.12- All receptacle outlets installed in house shall be tamper resistant type. Kitchen GFCI receptacles. April with Tesla Electric ###-#### called and stated she did not request an inspection and would check into it and find out who did.
|
ELE20-01928
| Rough-In Permanent Service | 6/15/2020 | 6/16/2020 | 6/16/2020 11:04:11 AM | A | PASS |
|
|
service entrance conductor installed Phone #: ###-#### Inspection requested via web by Troy Ballard Service complete. p/s u/g n ok
|
ELE20-01892
| Electrical Rough-In | 6/15/2020 | 6/16/2020 | 6/16/2020 9:29:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton City approved set of prints on site. Insulate ceiling and walls as noted on contractor print rough in ok cover
|