ELE20-01923
| Rough-In Permanent Service | 6/16/2020 | 6/16/2020 | 6/16/2020 2:32:18 PM | P | PASS |
|
|
We Are Rough In Ready Service Will Be Done Soon I Have A Grounding Question. Phone #: ###-#### Inspection requested via web by jason shifflett... rough in ok to cover uffer needs addressed p/s o/h new ok
|
ELE20-01348
| Electrical Rough-In | 6/10/2020 | 6/16/2020 | 6/16/2020 1:23:38 PM | A | PASS |
|
|
Screened- parcel hold has nothing to do with this permit- Jen Phone #: ###-####...UL listings verified
|
ELE20-01348
| Permanent Service | 6/11/2020 | 6/16/2020 | 6/16/2020 1:22:26 PM | P | FAIL |
|
|
Screened- Jen Phone #: ###-#### ext123... 1) fees need corrected..a service change is being done 2) panels cannot be installecd in closets 3) grounding needs to be brought up to code for service
service to be put back to original...no inspection can be done
|
ELE20-01978
| Permanent Service | 6/16/2020 | 6/16/2020 | 6/16/2020 12:18:24 PM | P | PASS |
|
|
East end Phone #: ###-#### Inspection requested via web by Kevin Burke.... p/s u/g new ok...13 meters needed
|
ELE20-02007
| Rough-In Permanent Service | 6/16/2020 | 6/16/2020 | 6/16/2020 11:57:43 AM | P | CANC |
|
|
This is a residential service upgrade. The inspection needs to take place to have Idaho Power energize today. Phone #: ###-#### >> Inspection requested via web by Steve Craig Inspection cancelled from web by: Steve Craig
|
ELE20-02026
| Final | 6/15/2020 | 6/16/2020 | 6/16/2020 11:51:16 AM | P | CANC |
|
|
Please contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior as they will need to meet inspector on-site. Thanks in advance. >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Joshua Hadzor
|
ELE18-01627
| Final | 6/16/2020 | 6/16/2020 | 6/16/2020 11:18:00 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark Morgan...ok to final
|
ELE20-01774
| Final | 6/15/2020 | 6/16/2020 | 6/16/2020 10:35:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley...ok to final
|
ELE20-01774
| Electrical Rough-In | 6/16/2020 | 6/16/2020 | 6/16/2020 10:35:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley...UG feed to shop...PVC..18" trench...ok to cover
|
ELE20-01319
| Final | 6/16/2020 | 6/16/2020 | 6/16/2020 9:48:45 AM | A | PASS |
|
|
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... labelling, disconnect, and OCPD ok
|
ELE20-01319
| Electrical Rough-In | 6/15/2020 | 6/16/2020 | 6/16/2020 9:48:06 AM | A | PASS |
|
|
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listings verified
|
ELE20-02031
| Electrical Rough-In | 6/15/2020 | 6/16/2020 | 6/16/2020 9:08:40 AM | A | PASS |
|
|
Call Kent ###-#### for access. If you have any questions please feel free to contact Fred ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan..
new can lights front of garage in eve...fished in front porch new lighting...5 lights..ok to cover existing front post light wiring needs addressed...front door posts either side and front post light RT of driveway entry
|
ELE19-03867
| Final | 6/15/2020 | 6/16/2020 | 6/16/2020 8:29:03 AM | A | PASS |
|
|
Access code is the address # Phone #: ###-#### Inspection requested via web by jamie berg...corrections made...ok to final
|