BLD96-01049
| INSP - Conference | 6/17/1996 | 6/17/1996 | 6/17/1996 12:00:00 AM | | PASS |
|
|
/ / 342 - insulating great room rafter to roof deck w/r-30 insulation
|
BLD96-01049
| INSP - Framing/Rough-in | 6/17/1996 | 6/17/1996 | 6/17/1996 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
BLD96-01503
| INSP - Framing/Rough-in | 6/17/1996 | 6/17/1996 | 6/17/1996 12:00:00 AM | | NH |
|
|
/ / 342 -
|
BLD96-01503
| INSP - Framing/Rough-in | 6/14/1996 | 6/17/1996 | 6/17/1996 12:00:00 AM | A | NR |
|
|
06/17/96 342 -
|
BLD96-01227
| INSP - Foundation | 6/17/1996 | 6/17/1996 | 6/17/1996 12:00:00 AM | P | PASS |
|
|
06/17/96 342 -
|
BLD96-00744
| INSP - Final | 6/17/1996 | 6/17/1996 | 6/17/1996 12:00:00 AM | P | PASS |
|
|
06/17/96 342 -
|
BLD96-01049
| INSP - Energy code compliance | 6/17/1996 | 6/17/1996 | 6/17/1996 12:00:00 AM | P | CANC |
|
|
06/17/96 342 - needed conference and frame inspection
|
BLD96-00150
| INSP - Final | 6/14/1996 | 6/17/1996 | 6/16/1996 12:00:00 AM | A | PASS |
|
|
06/14/96 342 - WHATS HAPPENING WITH THIS DUDE? IT WAS SENT OUT TO PERRY NO
|
BLD96-00571
| INSP - Foundation | 6/14/1996 | 6/17/1996 | 6/16/1996 12:00:00 AM | A | PART |
|
|
06/14/96 342 - REBAR for z that was poured out of position and SW retain waiting on eng report for fix of z...Marcum said they might as well call eng whenever they pour rather than the Building Dept (specifically inspe
|
BLD96-00713
| INSP - Framing/Rough-in | 6/14/1996 | 6/17/1996 | 6/16/1996 12:00:00 AM | A | PART |
|
|
06/14/96 342 - REINSPECTION
|
BLD96-01212
| INSP - Conference | 6/14/1996 | 6/17/1996 | 6/16/1996 12:00:00 AM | A | PASS |
|
|
06/14/96 342 - Earl Gafford called and I mentioned a soils report or com fill to be placed
|
BLD96-01534
| INSP - Roof | 6/14/1996 | 6/17/1996 | 6/16/1996 12:00:00 AM | A | CANC |
|
|
06/14/96 342 - roof start could not find and Molly said it is in Dick's area....transferred to Wei
|