PLM02-01744
| Water and/or Sewer | 6/14/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | A | PASS |
|
|
###-#### there is only one sewer and one water service to this duplex 6/17/2002 10:18:46 AM
|
PLM01-03593
| Final | 6/14/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | A | PASS |
|
|
FN INSP- BILL ###-#### gary did friday 6/17/2002 9:44:10 AM
|
PLM02-01758
| Sprinkler (Final) | 6/14/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | A | PASS |
|
|
###-#### scott
|
PLM02-01761
| Sprinkler (Final) | 6/17/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | P | PART |
|
|
backflow ###-#### cameron tie in ok , will have future valves certified prior to calling for inspection 6/17/2002 2:52:39 PM
|
PLM02-01763
| Water and/or Sewer | 6/17/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | P | PASS |
|
|
###-#### shelby
|
PLM02-00928
| Plumbing Rough-in | 6/17/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | P | PASS |
|
|
###-#### ri ok with water lines tented in attic 6/17/2002 4:22:40 PM
|
PLM02-01511
| Final | 6/17/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | P | NH |
|
|
bill this is a warehouse and you will need to call about 45 min before going there so some one from air van can unlock the door for you rob at ###-#### ///air van pat or kevin ###-#### called plumber and tenant left message, noone called, would love to go out to do inspection but wouldn't be able to get in without tenant there. 6/17/2002 4:24:04 PM
|
PLM02-01253
| Final | 6/17/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | P | PASS |
|
|
rob ###-#### no master ri r 6/17/2002 3:32:11 PM equired just set new fixtures final ok with main bath lav calked 6/17/2002 3:32:39 PM
|
PLM02-01770
| Plumbing Rough-in | 6/17/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | P | PASS |
|
|
###-####- marv r/i
|
PLM02-01774
| Plumbing Rough-in | 6/17/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 11:24:58. Contact: ###-####.
|