Inspections for the day of: Monday, June 17, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00704 Final6/14/20026/17/20026/17/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/14/2002 at 11:34:09. Contact: .
MEC02-01397 Rough-in6/14/20026/17/20026/17/2002 12:00:00 AMANR
Scheduled by Inspector: 350 On 6/14/2002 2:59:33 PM
MEC02-01311 Rough-in6/14/20026/17/20026/17/2002 12:00:00 AMANR
###-#### joe r/i $42.00 reinsp fee 6/17/2002 12:09:23 PM
MEC02-00906 Final6/14/20026/17/20026/17/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/14/2002 at 16:59:07. Contact: ###-####.
MEC01-03779 Final6/17/20026/17/20026/17/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/17/2002 at 09:13:28. Contact: ###-####. remove blue goop from single wall/b-vent connection..gas leaking at range 6/18/2002 12:22:26 PM
MEC02-00776 Final6/17/20026/17/20026/17/2002 12:00:00 AMPFAIL
###-#### pj smith fn need 6" clear from single wall y at garage ceiling 6/17/2002 3:11:46 PM
MEC02-00786 Final6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
pj smith-- 761/3551
MEC02-01311 Rough-in6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/17/2002 at 10:01:36. Contact: ###-####.
MEC02-01311 Pressure Test6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/17/2002 at 10:02:23. Contact: ###-####.
MEC02-00955 Final6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
###-#### sandy fn -re-insp
MEC02-01397 Rough-in6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
ROBIN ###-#### ok to cover mech room 6/17/2002 5:18:32 PM