Inspections for the day of: Monday, June 17, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-01603 Final6/14/20026/17/20026/17/2002 12:00:00 AMAPASS
fn for homeowner mr. lim ###-####
BLD02-00531 BLD-Conference6/14/20026/17/20026/17/2002 12:00:00 AMAPART
###-#### mike
ok to stand attic firewall 6/17/2002 10:49:12 AM
BLD02-01264 BLD-Framing/Rough-in6/14/20026/17/20026/17/2002 12:00:00 AMAPASS
fr insp -jim -###-####
BLD01-02944 BLD-Framing/Rough-in6/14/20026/17/20026/17/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/14/2002 at 10:42:10. Contact: ###-####.
ok to start on straw bales,, elec. to be done later 6/17/2002 4:24:37 PM
MEC02-01274 Pressure Test6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
TONY THE GAS COMPANY REQUESTED THAT A 60 LB TEST BE DONE ON THIS ... NORTHWAST 342 -4741
60 psi20 min 6/17/2002 3:43:39 PM
BLD02-00988 BLD-Framing/Rough-in6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
fr insp ###-####--dan call st before insp
BLD00-02921 BLD-Final6/17/20026/17/20026/17/2002 12:00:00 AMPFAIL
###-#### PLEASE CALL 1ST STEVE
need handrails, and seal firewall 6/17/2002 2:48:08 PM
BLD02-00523 BLD-Framing/Rough-in6/17/20026/17/20026/17/2002 12:00:00 AMPPASS
fr insp dwayne- ###-####
MEC02-01608 Rough-in6/17/20026/17/20026/17/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/17/2002 at 10:56:48. Contact: ###-####.
need to add 2 exhaust fans to permit and duct to the outside an existing fan 6/17/2002 3:43:10 PM