FIR01-00396
| INSP-Sprinkler Rough-in/Hydro | 6/14/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | A | PART |
|
|
Hydro test of both FDCs and the 1st floor dry system OK. 6/17/2002 3:46:37 PM
|
BLD01-00736
| FIRE-Final Inspection | 6/14/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | A | FAIL |
|
|
provide "area of refuge signs", provide and test firemans phone system, provide emergency lights in conference room, repair emergency lights in small conference room, repair emergency light in 1st floor elev. lobby, repair emergency lights in central corridor on 1st floor, provide a fire extinguisher in main lobby, install occupancy load signs in assembly areas 6/17/2002 3:00:02 PM
|
FIR01-00472
| INSP-Final Inspection | 6/14/2002 | 6/17/2002 | 6/17/2002 12:00:00 AM | A | FAIL |
|
|
only one item on correction notice has been completed. 6/17/2002 3:02:15 PM
|