BLD00-02394
| BLD-Aging Inspection | 6/17/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | | PASS |
|
|
2nd phase (south side) demo/retrofit work has begun. 6/17/2003 10:25:57 AM
|
BLD00-02729
| BLD-Aging Inspection | 6/17/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | | PASS |
|
|
see history, WIP. 6/17/2003 10:22:36 AM
|
MIS01-00231
| MIS-Aging Inspection | 6/17/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | | DONE |
|
|
Boise Tower....excavation 6/17/2003 10:23:39 AM
|
BLD02-02708
| BLD-Final | 6/17/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | A | PASS |
|
|
|
BLD03-00642
| BLD-Conference | 6/17/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | A | PASS |
|
|
rec'd resubmittal re shaft wall & susp 1hr lid...ok 6/17/2003 2:08:22 PM
|
BLD99-03154
| BLD-Conference | 6/4/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | A | PASS |
|
|
Bill Molina...will re- call for final 6/18/2003 2:05:54 PM
|
BLD02-02708
| BLD-Conference | 6/16/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | A | PASS |
|
|
carl, call tony 1st...coating meets req't. 6/17/2003 10:13:15 AM
|
BLD02-02890
| BLD-Footing | 6/16/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | A | PART |
|
|
curt; Phone #: ###-#### Internet Inspection Request from: Annette Moore...installing verts at front wall, rest ok. 6/17/2003 9:45:54 AM
|
BLD02-02687
| BLD-Framing/Rough-in | 6/16/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | A | PART |
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore...susp lid at corridor ok...seal firestop at bulkheads at lobby for 1hr wall const....s/f damper to be installed at 1 hvac duct at lobby. 6/17/2003 2:01:37 PM
|
BLD02-02596
| BLD-Final | 6/16/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | A | PASS |
|
|
eva; Phone #: ###-#### Internet Inspection Request from: Annette Moore...ok for l/c 6/17/2003 10:11:12 AM
|
BLD03-01020
| BLD-Concrete | 6/16/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 6/16/2003 at 4:44:48 PM. Contact: ###-####.
|
BLD00-01151
| BLD-Conference | 6/16/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | P | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...complete restrooms; W.C. locations ok as discussed ... floor mount/rear discharge 6/17/2003 3:22:04 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 6/16/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | P | PART |
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; 4hr wall wip. continue wall thru 4th level at corridor. 6/17/2003 3:26:44 PM
|
BLD02-02708
| BLD-Final | 6/17/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | P | PASS |
|
|
ok for c/o 6/17/2003 2:07:16 PM
|
BLD02-02553
| BLD-Conference | 6/17/2003 | 6/17/2003 | 6/17/2003 12:00:00 AM | P | PASS |
|
|
w/ Steed ...rec'd 1hr suspended corridor lid detail, ok 6/18/2003 9:06:56 AM
|