Inspections for the day of: Friday, June 17, 2005.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-00650 BLD-Conference6/17/20056/17/20056/17/2005 3:41:56 PMPPART
Scheduled by a contractor via Hello! on 6/17/2005 at 7:46:33 AM. Contact: ###-####. Already discussed with Jim Sly on 6/16
BLD04-00300 BLD-Framing/Rough-in6/17/20056/17/20056/17/2005 2:09:07 PMPPASS
ceiling grid///doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. 2nd floor ok
BLD04-00590 BLD-Conference5/19/20056/17/20056/17/2005 1:48:58 PMPPEND
Work is in progress, Exit signs on order, wiring required in ceiling for signs.
BLD05-00931 BLD-Framing/Rough-in6/16/20056/17/20056/17/2005 11:07:36 AMAPASS
alan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-00788 BLD-Framing/Rough-in6/16/20056/17/20056/17/2005 10:43:30 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-01139 BLD-Framing/Rough-in6/16/20056/17/20056/17/2005 10:31:09 AMAPASS
ceiling insp -call 1/2 hr before insp rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. All corrections from c/n have been addresed and fixed.-o.k.
MIS05-00090 BLD-Final6/16/20056/17/20056/17/2005 9:45:46 AMAFAIL
darlene-- ###-#### or cell ###-#### --call 1st for access-for verification of removel of running gear for block & tie-also sign form. Tie downs spaced further than 11ft. o.c. owner noted that four additional tie downs are to be installed.