PLM07-02178
| Plumbing Rough-in | 6/17/2008 | 6/17/2008 | 6/17/2008 3:46:35 PM | P | PART |
|
|
Mike Phone #: ###-#### 2nd floor w/v tested ok.........ds
|
PLM08-01413
| Plumbing Rough-in | 6/17/2008 | 6/17/2008 | 6/17/2008 2:44:49 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/17/2008 at 7:54:20 AM. Contact: ###-####.
|
PLM08-01207
| Plumbing Rough-in | 6/16/2008 | 6/17/2008 | 6/17/2008 1:13:15 PM | A | PASS |
|
|
Bill- roof drains Phone #: ###-####
|
ESC08-00174
| Random Inspection | 6/17/2008 | 6/17/2008 | 6/17/2008 10:22:42 AM | A | PASS |
|
|
sign posted and bmp's in place...........ds
|
PLM08-01425
| Final | 6/16/2008 | 6/17/2008 | 6/17/2008 9:46:53 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/16/2008 at 2:54:53 PM. Contact: ###-####.
|