ELE08-01543
| Conference | 6/17/2008 | 6/17/2008 | 6/17/2008 4:52:05 PM | P | PASS |
|
|
daryl Phone #: ###-#### ok conf with joe from ul on the equip. note esc permit in project
|
ELE08-01357
| Rough-In Permanent Service | 6/17/2008 | 6/17/2008 | 6/17/2008 4:51:25 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/17/2008 at 7:14:03 AM. Contact: ###-####. ok cover ri p/s u/g n ok
|
ESC08-00052
| General Inspection | 6/17/2008 | 6/17/2008 | 6/17/2008 3:31:44 PM | P | PASS |
|
|
sign post site looks ok dumpster on site
|
ELE07-02698
| Final | 6/17/2008 | 6/17/2008 | 6/17/2008 12:26:58 PM | P | PASS |
|
|
Brian Phone #: ###-#### ok final note no esc permit in project
|
ELE08-01625
| Rough-In Permanent Service | 6/16/2008 | 6/17/2008 | 6/17/2008 11:39:46 AM | A | PART |
|
|
darren Phone #: ###-#### ok cover walls & ceiling in garage t/w darren regarding service no under ground inspection & needs lock down breaker in main lug panel in garage
|
ESC08-00348
| General Inspection | 6/17/2008 | 6/17/2008 | 6/17/2008 9:56:24 AM | A | PASS |
|
|
sign posted site look fine
|
ELE07-04161
| Electrical Rough-In | 6/16/2008 | 6/17/2008 | 6/17/2008 8:54:39 AM | A | PASS |
|
|
Call to meet in main lobby Phone #: ###-#### Internet Inspection Request from: mark morris ok cover walls only anop note no esc permit in project
|