BLD08-00254
| BLD-Final | 6/17/2008 | 6/17/2008 | 6/17/2008 4:31:03 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/17/2008 at 8:21:13 AM. Contact: ###-####.ok for temp occ ok for perm occ after fire gos perm
|
BLD07-02865
| BLD-Framing/Rough-in | 6/17/2008 | 6/17/2008 | 6/17/2008 2:04:19 PM | P | PASS |
|
|
Jacob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD07-02865
| BLD-Energy code compliance | 6/17/2008 | 6/17/2008 | 6/17/2008 2:04:03 PM | P | PASS |
|
|
Jacob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD07-01248
| BLD-Conference | 6/17/2008 | 6/17/2008 | 6/17/2008 2:02:54 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/17/2008 at 7:29:34 AM. Contact: ###-####. fire caulk top of wall conf rm ok to cover
|
BLD06-01451
| BLD-Wall cover | 6/14/2008 | 6/17/2008 | 6/17/2008 11:22:31 AM | A | PART |
|
|
Dave; If you need to,could you inspect the nailing on the exterior wall ply, from the middle of the 3rd level thru the 4th level? 8" and 12" is the nailing pattern. I will be out of town this week.Could you leave a message on my cell if there is a problem? Otherwise, I will tell the drywaller to continue with the exterior drywall. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin ok to start rocking ext walls
|
BLD08-01018
| BLD-Framing/Rough-in | 6/16/2008 | 6/17/2008 | 6/17/2008 11:21:24 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 6/16/2008 at 4:43:57 PM. Contact: ###-####.needs trades to get r/is
|
BLD08-00766
| BLD-Framing/Rough-in | 6/16/2008 | 6/17/2008 | 6/17/2008 10:43:19 AM | A | PASS |
|
|
Don Phone #: ###-#### ok to insulate
|
BLD06-02303
| BLD-Concrete | 6/16/2008 | 6/17/2008 | 6/17/2008 10:17:20 AM | A | PART |
|
|
brad - ###-#### - 15th floor
|
BLD06-02303
| BLD-Framing/Rough-in | 6/17/2008 | 6/17/2008 | 6/17/2008 10:16:13 AM | A | PART |
|
|
brad - ###-#### - close up inspection ext walls by stair towers floors 4-8
|