ESC05-02074
| Site Final | 6/17/2008 | 6/17/2008 | 6/17/2008 3:49:08 PM | P | PASS |
|
|
All work has been completed. CAS #460
|
ESC07-01576
| General Inspection | 6/10/2008 | 6/17/2008 | 6/17/2008 3:38:25 PM | A | CANC |
|
|
Told the RP (Matt Brown to e-mail Steve Webb with his info pertaining with this project to update the RP. CAS #460
|
ESC08-00465
| Tracking Control | 6/16/2008 | 6/17/2008 | 6/17/2008 2:07:31 PM | P | PASS |
|
|
|
ESC08-00252
| General Inspection | 6/17/2008 | 6/17/2008 | 6/17/2008 1:59:56 PM | P | PART |
|
|
Need to maintain silt fence next to the entrance and by both vertical pipe at the irragtion. Also move the ESC sign to the entrance coming from the racket club parking lot. Will re-inspect on 6/20/08 CAS #460
|
ESC08-00400
| BMP Violation | 6/13/2008 | 6/17/2008 | 6/17/2008 1:08:19 PM | A | PART |
|
|
All drains have been protected out by the Morrison Building. Maintenance required on drain inside the project area. Recommend additional protection of a sediment bmp along certain areas of the river where the soil is sitting above the wattle that already is exsisting. Will re-inspect on 6/24/08 CAS #460
|